
162
2.17 CRANE OPERATION POSTURE
To proceed to the crane operation from the state mentioned in “OPERATION 2.16 OPERATION
BEFORE CRANE WORK”, bring the crane into a state ready for operation by following the steps
mentioned below.
1. Push the right control lever (1) forward to unwind the
wire rope to an extent that the hook block does not
come into contact with the ground.
NOTES
If the hook block is secured to the hook stowage wire,
remove the hook block from the stowage wire.
2. Push the right control lever (1) to the left to raise the
boom to a position where the hook block is not
over-wound and makes no contact with the ground.
Содержание MC815C
Страница 2: ......
Страница 30: ...20 This Page Intentionally Left Blank...
Страница 73: ...63 3 Total load chart 106 2186300...
Страница 75: ...65 9 Precautions when using 106 2186600...
Страница 76: ...66...
Страница 82: ...72 This Page Intentionally Left Blank...
Страница 197: ...187 Remote control menu...
Страница 254: ...244 This Page Intentionally Left Blank...
Страница 314: ...304...
Страница 338: ...328 This Page Intentionally Left Blank...
Страница 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Страница 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Страница 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Страница 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 398: ...388 This Page Intentionally Left Blank...
Страница 402: ...392 1 Searcher hook working range diagram 106 2189200...
Страница 403: ...393 6 Maximum rated total load 106 4716100 2 locations 7 Notice on pin holes CL000100001 2 locations...
Страница 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 426: ......