
216
6. Start the engine and shift the right control lever into the
“Raise” position (push it to the left), and raise the boom
until the maximum boom angle is reached.
7. Shift the left control lever into the “Extension” side
(push it forward) to fully extend the boom.
8. Shift the right control lever into the “Up” or “Down” side,
and repeat winding and unwinding the hook block
several times.
9. Spool the wire rope tight and close together on the
winch drum with tensioned wraps.
10. Repeat the above steps to minimize the twists in the
wire rope.
If the above steps do not solve the problem, replace the
twisted wire rope with new one.
Содержание MC815C
Страница 2: ......
Страница 30: ...20 This Page Intentionally Left Blank...
Страница 73: ...63 3 Total load chart 106 2186300...
Страница 75: ...65 9 Precautions when using 106 2186600...
Страница 76: ...66...
Страница 82: ...72 This Page Intentionally Left Blank...
Страница 197: ...187 Remote control menu...
Страница 254: ...244 This Page Intentionally Left Blank...
Страница 314: ...304...
Страница 338: ...328 This Page Intentionally Left Blank...
Страница 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Страница 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Страница 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Страница 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 398: ...388 This Page Intentionally Left Blank...
Страница 402: ...392 1 Searcher hook working range diagram 106 2189200...
Страница 403: ...393 6 Maximum rated total load 106 4716100 2 locations 7 Notice on pin holes CL000100001 2 locations...
Страница 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 426: ......