
212
4.3 MACHINE OPERATION
CAUTION
After warm-up operation, before operating the crane, see from “OPERATION 2.5
MACHINE TRAVELLING POSTURE” to ”OPERATION 2.25 PROHIBITED OPERATIONS
DURING CRANE WORK”.
4.4 MACHINE STOP AND CHECKS AFTER STOPPING MACHINE
1. Turn the starter switch key to the “OFF” position.
The electric motor stops.
2. Remove the starter switch key.
3. Visually check for oil leakage, and check around the
crawlers, crane, and exterior of the machine. If you find
any leakage or abnormality, fix the problem.
4. Clean off the crawlers and outriggers, removing mud.
5. Keep the area around the inverter unit free of dead
leaves and paper waste. A potential fire could occur if
disregarded.
Содержание MC815C
Страница 2: ......
Страница 30: ...20 This Page Intentionally Left Blank...
Страница 73: ...63 3 Total load chart 106 2186300...
Страница 75: ...65 9 Precautions when using 106 2186600...
Страница 76: ...66...
Страница 82: ...72 This Page Intentionally Left Blank...
Страница 197: ...187 Remote control menu...
Страница 254: ...244 This Page Intentionally Left Blank...
Страница 314: ...304...
Страница 338: ...328 This Page Intentionally Left Blank...
Страница 343: ...333 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 344: ...334 3 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Страница 357: ...347 5 WORKING RADIUS LIFTING HEIGHT...
Страница 362: ...352 1 Diagram of fly jib working range chart 106 2189200...
Страница 397: ...387 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 398: ...388 This Page Intentionally Left Blank...
Страница 402: ...392 1 Searcher hook working range diagram 106 2189200...
Страница 403: ...393 6 Maximum rated total load 106 4716100 2 locations 7 Notice on pin holes CL000100001 2 locations...
Страница 424: ...414 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 426: ......