Chapter 3
Preparing Superdome for Booting
Attaching the Leveling Feet and Leveling the SPU Cabinet
41
Attaching the Leveling Feet and Leveling the SPU Cabinet
After you position the SPU cabinet, attach and adjust the leveling feet using the following procedure:
Step 1. Remove the leveling feet from their packages.
Step 2. Attach the leveling feet to the cabinet using four (T25 Torx) screws.
Figure 3-9Attaching the Leveling Feet
Step 3. Screw down each leveling foot clockwise, until it is in firm contact with the floor.
6/2/00
60IN016A
BPS 5
BPS 4
Содержание 9000 Superdome
Страница 8: ...Contents 8 ...
Страница 9: ...9 Preface ...
Страница 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Страница 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Страница 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Страница 24: ...24 ...
Страница 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Страница 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Страница 146: ...Chapter 6 Troubleshooting and Installation Related Tasks Installing a PCI I O Card While the Cell is Off 122 ...
Страница 154: ...Chapter 7 No Boot Disk Superdome Installations Installing the Superdome Operating System From Available Media 130 ...
Страница 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Страница 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Страница 193: ...Appendix F 169 F A180 Support Management Station ...
Страница 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Страница 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...