Chapter 2
Unpacking and Inspecting
Unpacking and Inspecting Superdome Hardware Components
25
Step 1. After opening the other boxes and removing their contents, find the carton marked MANUALS
AND ACCESSORIES and remove the checklist.
Step 2. Open all other cartons and make sure all of the equipment on the list has been received. This
includes options, spare parts, cables, and software. Refer to the original purchase order, if required.
Step 3. If optional assemblies or cards have been ordered separately, make sure they have been furnished
with the shipment, and are in accordance with the purchase order.
Step 4. Make sure that the system model number and serial number are identical to those specified on the
packing list. The numbers are printed on the System Information Labels located at the bottom
front of the system. They are accessible by opening the front door.
Содержание 9000 Superdome
Страница 8: ...Contents 8 ...
Страница 9: ...9 Preface ...
Страница 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Страница 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Страница 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Страница 24: ...24 ...
Страница 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Страница 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Страница 146: ...Chapter 6 Troubleshooting and Installation Related Tasks Installing a PCI I O Card While the Cell is Off 122 ...
Страница 154: ...Chapter 7 No Boot Disk Superdome Installations Installing the Superdome Operating System From Available Media 130 ...
Страница 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Страница 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Страница 193: ...Appendix F 169 F A180 Support Management Station ...
Страница 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Страница 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...