17
IMPORTANT
Refer to Table 4 to select the appropriate size circuit breaker for systems configured without a
full complement of cells, memory, and I/O.
Table 4 shows Superdome power requirements by configuration (i.e. number of cell boards, amount of memory
per cell, and number of I/O chassis). This requirement applies to 32-way-capable systems with PA8600 or
PA8700 processors.
There are two columns of power numbers (Watts). The Power Breaker column shows the power used to size
the wall breaker at the installation site. The Typical Power column shows typical power. Typical power
numbers are for PA8600 systems and may be used to assess average utility cost of cooling and electrical
power. Expect these typical numbers to be about 18% less for PA8700 systems. Table 4 also shows the
recommended breaker sizes for 4-wire and 5-wire sources
Table 4
Typical Superdome Configurations
Cell
Boards
Memory
Per Cell
Board
I/O
Chassis
Modules
Breaker
Power
a
Recommended
3-pole Breaker
Size
a,b
Recommended
4-pole Breaker
Size
a,c
Typical
Power
Typical
Cooling
Qty.
GBytes
Qty.
Watts
Amps (min.)
Amps (min.)
Watts
BTU/HR
8
16
4
10660
40
25
8460
28,850
8
16
2
9600
40
25
7780
26,530
8
8
4
9220
40
25
7340
25,030
8
8
2
8160
30
20
6660
22,710
8
4
4
8500
35
20
6780
23,120
8
4
2
7440
30
20
6100
20,800
6
16
4
9040
35
20
7140
24,350
6
16
2
7980
30
20
6460
22,030
6
8
4
7960
30
20
6300
21,480
6
8
2
6900
30
20
5620
19,160
6
4
4
7420
30
20
5880
20,050
6
4
2
6360
30
20
5200
17,730
4
16
4
7420
30
20
5820
19,850
4
16
2
6360
30
20
5140
17,530
4
8
4
6700
30
20
5260
17,940
4
8
2
5640
25
20
4580
15,620
4
4
4
6340
30
20
4980
16,980
Содержание 9000 Superdome
Страница 8: ...Contents 8 ...
Страница 9: ...9 Preface ...
Страница 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Страница 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Страница 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Страница 24: ...24 ...
Страница 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Страница 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Страница 146: ...Chapter 6 Troubleshooting and Installation Related Tasks Installing a PCI I O Card While the Cell is Off 122 ...
Страница 154: ...Chapter 7 No Boot Disk Superdome Installations Installing the Superdome Operating System From Available Media 130 ...
Страница 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Страница 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Страница 193: ...Appendix F 169 F A180 Support Management Station ...
Страница 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Страница 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...