Chapter 1
Introduction
Manual Scope
4
Customer Responsibilities
Before the system can be installed, the system site must comply with the specifications outlined in the Site
Preparation Guide, which can be found at the following URL: http://docs.hp.com or on the Customer CD-ROM
that came with the system.
The service and installation requirements for any peripheral equipment to be installed with the system
should also be taken into consideration before the installation process gets under way. Refer to the
appropriate manual for each peripheral being installed.
Customer Engineer Responsibilities
The CE is responsible for verifying that the site has been prepared for the Superdome, making sure that the
site is properly grounded and that the power requirements have been met. In general, the CE is responsible
for unpacking, installing the Superdome in the computer room (including installing the optional Support
Management Station, sometimes called a teststation), powering on and booting each configured partition to
the HP-UX prompt, and cleaning up the installation site.
Accepting the Equipment
The customer should oversee the arrival of the equipment, including checking the inventory and moving the
equipment to the final installation location.
The customer and the field engineer should inspect the equipment when it is unpacked and inventory the
equipment with the Sales Order Packing Slip or the customer’s Bill of Material. It is the customer’s
responsibility to obtain and complete a damage claim form from the shipping representative if the system has
been damaged. Refer to “Inspecting the Shipping Containers for Damage” on page 13 for more information on
checking the inventory.
Associated Documentation
•
Superdome Site Preparation Guide, HP 9000 Systems, Fourth Edition, HP Manufacturing Part Number
A5201-10011
•
Instant Capacity On Demand (iCOD) Release Notes for Version x.x, HP Manufacturing Part Number
B9073-90003
•
Managing Superdome Complexes — A Guide for HP-UX System Administrators
•
Ignite-UX Administration Guide — HP 9000 Computers with HP-UX 10.x or 11.x
Most of these documents may be found at one or more of these places:
•
http://docs.hp.com
•
http://superdome.hp.com
•
Customer CD-ROM that came with the system
•
Electronic Performance Support System (EPSS) CD-ROM
Содержание 9000 Superdome
Страница 8: ...Contents 8 ...
Страница 9: ...9 Preface ...
Страница 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Страница 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Страница 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Страница 24: ...24 ...
Страница 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Страница 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Страница 146: ...Chapter 6 Troubleshooting and Installation Related Tasks Installing a PCI I O Card While the Cell is Off 122 ...
Страница 154: ...Chapter 7 No Boot Disk Superdome Installations Installing the Superdome Operating System From Available Media 130 ...
Страница 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Страница 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Страница 193: ...Appendix F 169 F A180 Support Management Station ...
Страница 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Страница 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...