
Chapter 2
Unpacking and Inspecting
Unpacking and Inspecting Superdome Hardware Components
19
Step 6. Remove the ramps from the pallet and set them aside.
Figure 2-5Removing the Ramps from the Pallet
Step 7. Remove the plastic anti-static bag by lifting it straight up off the cabinet, and check for damage.
If you find damage, follow the claims procedure. Some damage may be repaired by replacing the
damaged part.
If extensive damage is found, it may be necessary to repack and return the entire cabinet to HP.
Exterior:
Check the cabinet exterior for signs of shipping damage:
Step 1. Look at the top and sides for dents, warpage, or scratches.
60IN013B
5/31/01
Ramps
Содержание 9000 Superdome
Страница 8: ...Contents 8 ...
Страница 9: ...9 Preface ...
Страница 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Страница 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Страница 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Страница 24: ...24 ...
Страница 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Страница 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Страница 146: ...Chapter 6 Troubleshooting and Installation Related Tasks Installing a PCI I O Card While the Cell is Off 122 ...
Страница 154: ...Chapter 7 No Boot Disk Superdome Installations Installing the Superdome Operating System From Available Media 130 ...
Страница 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Страница 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Страница 193: ...Appendix F 169 F A180 Support Management Station ...
Страница 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Страница 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...