Chapter 5
Post Superdome System Installation Check
108
•
Inspect cabling. Check that all cables are installed, secured, and properly routed.
•
Inspect test points. Check that test leads are removed from the test points, and that the test points are
properly covered.
•
Clean up and dispose of debris. Remove all debris from the area, and dispose of it properly.
•
Perform final check. Inspect the area to ensure that all parts, tools, and other items used to install the
system are disposed of properly. Then, if you have not already done so, close and lock the doors.
•
Enter information in the Gold Book. When you complete the installation and cleanup, we recommend
that you make the appropriate notations in the Gold Book, which should have been shipped with the
system.
•
Obtain customer acceptance (if required). This includes thanking the customer for choosing
Hewlett-Packard.
Содержание 9000 Superdome
Страница 8: ...Contents 8 ...
Страница 9: ...9 Preface ...
Страница 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Страница 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Страница 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Страница 24: ...24 ...
Страница 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Страница 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Страница 146: ...Chapter 6 Troubleshooting and Installation Related Tasks Installing a PCI I O Card While the Cell is Off 122 ...
Страница 154: ...Chapter 7 No Boot Disk Superdome Installations Installing the Superdome Operating System From Available Media 130 ...
Страница 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Страница 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Страница 193: ...Appendix F 169 F A180 Support Management Station ...
Страница 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Страница 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...