Chapter 2
Unpacking and Inspecting
Unpacking the PDCA
27
a. Option 3 has been deleted.
b. A dedicated branch circuit is required for each PDCA installed.
c. Option 1 deleted January 2001.
d. 415 VAC phase-to-phase is possible.
e. Option 2 deleted January 2001.
f. Option 4 will be obsolete in the fourth quarter of 2001.
g. Refer to for detailed specifics related to this Option.
h. Option 5 will be obsolete in the fourth quarter of 2001.
Table 2-2
Option 4 through 7 Specifics
PDCA
Part Number
Attached Power Cord
Attached Plug
Receptacle
Required
A5201-69023
(Option 6)
OLFLEX 190 (PN 600804) is a
2.5 meter multi conductor,
600 volt, 90 degree C, UL and
CSA approved, oil resistant
flexible cable. (8 AWG 60 A
capacity)
Mennekes
ME 460P9
(60 A capacity)
Mennekes
ME 460R9
(60 A capacity)
A5201-69024
(Option 7)
H07RN-F (OLFLEX PN
1600130) is a 2.5 meter heavy
duty neoprene jacketed
harmonized European flexible
cable. (4 mm
2
32A capacity)
Mennekes
ME 532P6-14
(32A capacity)
Mennekes
ME 532R6-1500
(32 A capacity)
Connector
Provided
A5201-69009
(Option 4)
OLFLEX 190 (PN 600404) is a
2.5 meter multi conductor,
600 volt, 90 degree C, UL and
CSA approved, oil resistant
flexible cable. (100 A capacity)
Mennekes
ME 4100P9
(100 A capacity)
Mennekes
ME 4100C9
(100 A capacity)
A5201-69008
(Option 5)
H07RN-F (OLFLEX PN
1600111) is a 2.5 meter heavy
duty neoprene jacketed
harmonized European flexible
cable. (63 A capacity)
Mennekes
ME 563P6-1235
(63 A capacity)
Mennekes
ME 563C6-1245
(63 A capacity)
Содержание 9000 Superdome
Страница 8: ...Contents 8 ...
Страница 9: ...9 Preface ...
Страница 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Страница 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Страница 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Страница 24: ...24 ...
Страница 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Страница 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Страница 146: ...Chapter 6 Troubleshooting and Installation Related Tasks Installing a PCI I O Card While the Cell is Off 122 ...
Страница 154: ...Chapter 7 No Boot Disk Superdome Installations Installing the Superdome Operating System From Available Media 130 ...
Страница 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Страница 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Страница 193: ...Appendix F 169 F A180 Support Management Station ...
Страница 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Страница 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...