
Appendix A
hp Server rx2600 Support Management Station
Installing the hp Server rx2600 SMS
136
A template is supplied for determining the appropriate rack hole locations. There are a total of
eight mounting clips, four installed on each side of the rack for the front of the unit. There are a
total of four mounting clips, two installed on each side of the rack for the rear of the unit.
Figure A-7 Location of Front Mounting Clips for Tape Array 5300
Step 3. Install the Tape Array 5300 rack shelves into the rack using the supplied procedure.
The lower two mounting clips on the front and the two on the rack rear are used to mount a shelf on
each side.
Figure A-8 Tape Array 5300 Rack Shelf
Tape Array 5300 Rack Shelf
Содержание 9000 Superdome
Страница 8: ...Contents 8 ...
Страница 9: ...9 Preface ...
Страница 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Страница 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Страница 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Страница 24: ...24 ...
Страница 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Страница 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Страница 146: ...Chapter 6 Troubleshooting and Installation Related Tasks Installing a PCI I O Card While the Cell is Off 122 ...
Страница 154: ...Chapter 7 No Boot Disk Superdome Installations Installing the Superdome Operating System From Available Media 130 ...
Страница 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Страница 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Страница 193: ...Appendix F 169 F A180 Support Management Station ...
Страница 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Страница 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...