5-26
888-2586-001
9/15/06
WARNING: Disconnect primary power prior to servicing.
Platinum Z16HD+
Section 5 Maintenance and Alignment
STEP 1
Shut the transmitter off and remove AC power from the transmitter.
STEP 2
Remove the Master Controller Board. If only the EEPROM U39 is being
replaced then replace U39 with the new one, reinstall the Master
Controller Board and skip to Step 6. If the Master Controller is also
being replaced then proceed with the next step.
STEP 3
Install the new U39 in the new Master Controller Board.
STEP 4
To transfer the Firmware ICs from the old board to the new one or to
simply install new firmware refer to "5.16 Removing/Replacing
Firmware ICs" on page 5-30, then return here.
STEP 5
Set all dip switches on the new board according to the listing below and
install the Master Controller Board. Typical settings are:
•
S1-1 through S1-4 - Customer set RS-232 ID
•
S1-5 ON EEPROM mode select - must be ON for any IBOC mode.
•
S1-6 OFF (Factory Use Only)
•
S1-7 OFF (Not used)
•
S1-8 OFF (Factory Use Only)
•
S1-9 OFF (ON = Microcontroller RESET)
•
S1-10 ON (APC ON/OFF)
STEP 6
Turn on the Low Voltage breaker in the rear of the transmitter. If the
EEPROM is blank, the Fault Log will register EEPROM_DEF which
means it loaded the default settings for the EEPROM (these are listed in
Table 5-1). Reset the Fault Log.
STEP 7
All of the parameters in Table 5-1 are editable from the Diagnostics
Display and should be set to the values listed on the Factory test Data
sheet not necessarily the default values listed. If the Factory Test Data is
not available or you are not sure that the values in the Factory Test Data
are still valid then verify, and where necessary, change the values to
those listed in Table 5-1. (To edit any of these screens, press and hold
[D] and then press [C]. The edit controls should appear on the screen).
STEP 8
Press the HIGH ON button and then quickly press and hold the LOWER
button for 10 seconds. This will turn the transmitter on at zero power
output. Shut the transmitter OFF again.
STEP 9
Proceed to the following procedure "5.15 System Configuration and
Содержание Platinum Z16HD+
Страница 4: ...MRH 2 888 2586 001 9 15 06 WARNING Disconnect primary power prior to servicing ...
Страница 6: ...9 15 06 888 2586 001 MRH 1 WARNING Disconnect primary power prior to servicing ...
Страница 8: ...viii 888 2586 001 9 15 06 WARNING Disconnect primary power prior to servicing ...
Страница 10: ...x 888 2586 001 9 15 06 WARNING Disconnect primary power prior to servicing ...