background image

Document Information for:

Type

Name

Revision

State

Description

Originator

File List

Approval Information
Person

Action

Date and Time

This page is generated automatically by the GEMS ePDM System

Printed documents are for Reference Only and may be out-of-date.

Check the database to ensure you have the correct revision.

State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process. 

See the GEHC Myworkshop System to determine the status of this document.

5213326-100TPH

Drawing Print

5213326-100TPH

3
Release

ECO

2063269
Basic Service Manual for LOGIQ Uno Console

501568001_praveen__kumar

1.  5213326-100TPH_s2_r1.pdf

305018343_seshachala__bettadapura

Approved

09/10/2008 12:58:08 PM GMT

305018956_sandesh__n

Approved

09/11/2008 05:05:00 AM GMT

Approved Document - 5213326-100TPH_r3.pdf Page 1 of 252

Содержание LOGIQ A3

Страница 1: ...ASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent 5213326 100TPH Drawing Print 5213326 100TPH 3 Release ECO 2063269 Basic Service Manual for LOGIQ Uno Console 501568001_praveen__kumar 1 5213326 100TPH_s2_r1 pdf 305018343_seshachala__bettadapura Approved 09 10 2008...

Страница 2: ...2008 by General Electric Co Operating Documentation GE Healthcare State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 2 of 252 ...

Страница 3: ...e RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 3 of 252 ...

Страница 4: ...INTENANCE N A PAS ÉTÉ CONSULTÉ ET COMPRIS LE NON RESPECT DE CET AVERTISSEMENT PEUT ENTRAÎNER CHEZ LE TECHNICIEN L OPÉRATEUR OU LE PATIENT DES BLESSURES DUES À DES DANGERS ÉLECTRIQUES MÉCANIQUES OU AUTRES DIESES KUNDENDIENST HANDBUCH EXISTIERT NUR IN ENGLISCHER SPRACHE FALLS EIN FREMDER KUNDENDIENST EINE ANDERE SPRACHE BENÖTIGT IST ES AUFGABE DES KUNDEN FÜR EINE ENTSPRECHENDE ÜBERSETZUNG ZU SORGEN ...

Страница 5: ...E DI MANUTENZIONE È DISPONIBILE SOLTANTO IN INGLESE SE UN ADDETTO ALLA MANUTENZIONE ESTERNO ALLA GEMS RICHIEDE IL MANUALE IN UNA LINGUA DIVERSA IL CLIENTE È TENUTO A PROVVEDERE DIRETTAMENTE ALLA TRADUZIONE SI PROCEDA ALLA MANUTENZIONE DELL APPARECCHIATURA SOLO DOPO AVER CONSULTATO IL PRESENTE MANUALE ED AVERNE COMPRESO IL CONTENUTO NON TENERE CONTO DELLA PRESENTE AVVERTENZA POTREBBE FAR COMPIERE O...

Страница 6: ...ΣΤΗ Ή ΣΤΟΝ ΑΣΘΕΝΗ ΑΠΟ ΗΛΕΚΤΡΟΠΛΗΞΙΑ ΜΗΧΑΝΙΚΟΥΣ Ή ΑΛΛΟΥΣ ΚΙΝ ΥΝΟΥΣ EZEN KARBANTARTÁSI KÉZIKÖNYV KIZÁRÓLAG ANGOL NYELVEN ÉRHETŐ EL HA A VEVŐ SZOLGÁLTATÓJA ANGOLTÓL ELTÉRŐ NYELVRE TART IGÉNYT AKKOR A VEVŐ FELELŐSSÉGE A FORDÍTÁS ELKÉSZÍTTETÉSE NE PRÓBÁLJA ELKEZDENI HASZNÁLNI A BERENDEZÉST AMÍG A KARBANTARTÁSI KÉZIKÖNYVBEN LEÍRTAKAT NEM ÉRTELMEZTÉK EZEN FIGYELMEZTETÉS FIGYELMEN KÍVÜL HAGYÁSA A SZOLGÁLT...

Страница 7: ...LER PATIENTEN DEZE ONDERHOUDSHANDLEIDING IS ENKEL IN HET ENGELS VERKRIJGBAAR ALS HET ONDERHOUDSPERSONEEL EEN ANDERE TAAL VEREIST DAN IS DE KLANT VERANTWOORDELIJK VOOR DE VERTALING ERVAN PROBEER DE APPARATUUR NIET TE ONDERHOUDEN VOORDAT DEZE ONDERHOUDSHANDLEIDING WERD GERAADPLEEGD EN BEGREPEN IS INDIEN DEZE WAARSCHUWING NIET WORDT OPGEVOLGD ZOU HET ONDERHOUDSPERSONEEL DE OPERATOR OF EEN PATIËNT GEW...

Страница 8: ... USłUGI SERWISOWE WYMAGA UDOSTĘPNIENIA PODRĘCZNIKA W JĘZYKU INNYM NIŻ ANGIELSKI OBOWIĄZEK ZAPEWNIENIA STOSOWNEGO TłUMACZENIA SPOCZYWA NA KLIENCIE NIE PRÓBOWAĆ SERWISOWAĆ NINIEJSZEGO SPRZĘTU BEZ UPRZEDNIEGO ZAPOZNANIA SIĘ Z PODRĘCZNIKIEM SERWISOWYM NIEZASTOSOWANIE SIĘ DO TEGO OSTRZEŻENIA MOżE GROZIĆ OBRAŻENIAMI CIAłA SERWISANTA OPERATORA LUB PACJENTA W WYNIKU PORAŻENIA PRĄDEM URAZU MECHANICZNEGO LU...

Страница 9: ...CHANICKÉHO ALEBO INÉHO NEBEZPEČENSTVA DEN HÄR SERVICEHANDBOKEN FINNS BARA TILLGÄNGLIG PÅ ENGELSKA OM EN KUNDS SERVICETEKNIKER HAR BEHOV AV ETT ANNAT SPRÅK ÄN ENGELSKA ANSVARAR KUNDEN FÖR ATT TILLHANDAHÅLLA ÖVERSÄTTNINGSTJÄNSTER FÖRSÖK INTE UTFÖRA SERVICE PÅ UTRUSTNINGEN OM DU INTE HAR LÄST OCH FÖRSTÅR DEN HÄR SERVICEHANDBOKEN OM DU INTE TAR HÄNSYN TILL DEN HÄR VARNINGEN KAN DET RESULTERA I SKADOR ...

Страница 10: ...E MANUAL vii State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 10 of 252 ...

Страница 11: ...ctrical codes The purchaser of GE equipment shall only utilize qualified personnel i e GE s field engineers personnel of third party service companies with equivalent training or licensed electricians to perform electrical servicing on the equipment OMISSIONS ERRORS If there are any omissions errors or suggestions for improving this documentation please contact the GE Healthcare Global Documentati...

Страница 12: ...from time to time without written notice TRADEMARKS All products and their name brands are trademarks of their respective holders COPYRIGHTS All Material Copyright 2007 2008 by General Electric Company Inc All Rights Reserved State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu...

Страница 13: ...s 8 1 to 8 28 3 Important Precautions pages i to X 3 Chapter4 Functional checks pages 4 1 to 4 14 3 Chapter9 Renewalparts pages 9 1 to 9 8 3 Table of Contents pages TOC1 to TOC6 3 Chapter5 Components And functions pages 5 1 to 5 12 3 Chapter10 Care maintenance pages 10 1 to 10 30 3 Chapter 1 Introduction pages 1 1 to 1 18 3 Chapter6 Scan Adjustments pages 6 1 to 6 2 3 index 3 Chapter2 Preinstallat...

Страница 14: ...ntroduction 1 7 Human Safety 1 7 Mechanical Safety 1 7 Electrical Safety 1 8 Returning Shipping Probes and Repair Parts 1 8 Warning Label Locations 1 9 Dangerous Procedure Warnings 1 17 EMC EMI and ESD 1 17 Electromagnetic Compatibility 1 17 Electrostatic Discharge ESD Prevention 1 17 CE Compliance 1 17 Customer Assistance 1 18 Contact Information 1 18 System Manufacturer 1 19 State RELEASE Docu m...

Страница 15: ...2 3 Unit Power Plug 2 4 Power Stability Requirements 2 4 EMI Limitations 2 4 Probes Environmental Requirements 2 5 Time and Manpower Requirements 2 5 Facility Needs 2 6 Purchaser Responsibilities 2 6 Required Features 2 6 Desirable Ultrasound Room Facilities 2 7 Minimal Floor Plan Suggestion 2 8 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR...

Страница 16: ...13 Acoustic Noise Output 3 13 Electrical Specifications 3 13 Probe Transducer Connection 3 13 Power On Off Process 3 14 Scanner Power On 3 14 System Boot Up 3 15 Power Off Shutdown 3 16 System Power Down 3 16 Scanner Shutdown 3 17 System Configuration 3 18 System Configuration 3 18 System Settings 3 18 Network Connectivity 3 19 Storage And Operation Requirements 3 23 Optional Peripherals 3 23 Opti...

Страница 17: ...ation 3 29 GE Cares Sticker 3 30 User Manual s 3 30 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 17 of 252 ...

Страница 18: ...8 Performing B Mode Measurements Checks 4 8 Basic Measurements 4 9 Distance and Tissue Depth Measurements 4 9 Circumference Area Ellipse Measurement 4 9 Report Pages 4 9 Probe Connectors Usage 4 10 Connecting a probe 4 10 Activating the probe 4 10 Disconnecting the probe 4 10 Using Cine 4 11 Activating CINE 4 11 Image Management QG 4 11 CF Checks 4 11 Software Configuration Checks 4 11 Peripheral ...

Страница 19: ...d 5 5 Back End Module 5 6 System On Module SOM 5 6 Master Control Board MST 5 6 Power Supply LV HVPS 5 8 Rear Panel Assembly 5 9 Keyboard Assembly 5 10 Main PCB 5 10 TGC_PCB 5 10 LCD 5 11 Brightness adjustment 5 12 Circuit Boards Descriptions 5 12 ON OFF Signal Flow 5 13 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC...

Страница 20: ...urpose 6 1 Table Of Contents 6 1 Regulatory 6 1 Monitor Adjustment 6 2 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 20 of 252 ...

Страница 21: ... No Display 7 11 System does not Boot 7 12 System does not switch ON 7 13 Unable to Print on the Printers UPD897 Deskjet 7 14 No Keyboard response 7 15 No Image on External Monitor 7 16 Peripheral Power on Top Panel absent 7 17 Unable to Archive and Backup 7 18 TGC malfunction 7 19 Gain malfunction 7 20 Trackball malfunction 7 21 Service Diagnostics 7 22 State RELEASE Docu m ent is released and u ...

Страница 22: ...t Procedure 8 6 Monitor Holder Assembly FRU P N 5308054 8 7 Tools 8 7 Needed Manpower 8 7 Preparations 8 7 Removal procedure 8 7 Functional Checkout Procedure 8 8 Keyboard 8 9 Keyboard Assembly FRU P N 5168531 8 9 Tools 8 9 Needed Manpower 8 9 Preparations 8 9 Removal Procedure 8 9 Replace Keyboard Assembly 8 10 Functional Checkout Procedure 8 11 TGC PWA FRU Assy FRU P N 5266629 8 12 Tools 8 12 Ne...

Страница 23: ...out Procedure 8 21 Keyboard Cover Set FRU P N 5262766 8 22 Tools 8 22 Needed Manpower 8 22 Preparations 8 22 Removal procedure 8 22 Functional Checkout Procedure 8 23 Keyboard Knob Set FRU P N 5263937 8 24 Tools 8 24 Needed Manpower 8 24 Preparations 8 24 Removal procedure 8 24 Functional Checkout Procedure 8 25 Mechani cals 8 26 RH Side Cover FRU No 5265162 8 26 Tools 8 26 Needed Manpower 8 26 Pr...

Страница 24: ...arations 8 31 Removal Procedure 8 31 Functional Checkout Procedure 8 31 LH Arm Cover Front with GE Logo FRU P N 5263193 RH Arm cover Front with Labels FRU 5263420 8 32 Tools 8 32 Needed Manpower 8 32 Preparations 8 32 Removal Procedure 8 32 Functional Checkout Procedure 8 34 Front Bumper FRU No 5168362 8 35 Tools 8 35 Needed Manpower 8 35 Preparations 8 35 Removal Procedure 8 35 Functional Checkou...

Страница 25: ... Assy FRU No 5215345 8 42 Tools 8 42 Needed Manpower 8 42 Preparations 8 42 Removal Procedure 8 42 Functional Checkout Procedure 8 43 I O Interfaces 8 44 Rear Panel Assy FRU No 5196446 8 44 Tools 8 44 Needed Manpower 8 44 Preparations 8 44 Removal Procedure 8 44 Functional Checkout Procedure 8 45 Front Panel FRU P N 5192657 for 100 110V P N 5196449 for 220 240V 8 46 Tools 8 46 Needed Manpower 8 46...

Страница 26: ...edure 8 60 Functional Checkout Procedure 8 61 Back Plane Board FRU No 5183676 8 62 Tools 8 62 Needed Manpower 8 62 Preparations 8 62 Removal Procedure 8 62 Functional Checkout Procedure 8 63 Power Block 8 64 Transformer Assembly FRU No 5196448 8 64 Tools 8 64 Needed Manpower 8 64 Preparations 8 64 Removal Procedure 8 64 Functional Checkout Procedure 8 65 Power Entry Module 8 66 Tools 8 66 Needed M...

Страница 27: ...9 1 List of Abbreviations 9 1 Operator Console Assy 9 2 LOGIQ A3 Configuration 9 3 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 27 of 252 ...

Страница 28: ...10 9 General Cleaning 10 9 Air Filter Cleaning 10 9 Physical Inspection 10 10 Diagnostic Checks 10 11 View the Logs 10 11 Probe Maintenance 10 11 Probe Related Checks 10 11 Basic Probe Care 10 11 Basic Probe Cleaning 10 11 Electrical Safety Tests 10 12 Safety Test Overview 10 12 GEMS Leakage Current Limits 10 13 Outlet Test Wiring Arrangement USA Canada 10 14 Grounding Continuity 10 15 Meter Proce...

Страница 29: ...e Adapter Procedure 10 22 Data Sheet for Transducer Source Leakage Current 10 23 When There s Too Much Leakage Current 10 24 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 29 of 252 ...

Страница 30: ...vicing and periodic maintenance 5 Chapter 5 Components and Functions Contains block diagrams and functional explanations of the electronics 6 Chapter 6 Service Adjustments Contains instructions on how to make available adjustments to the LOGIQ A3 7 Chapter 7 Diagnostics Troubleshooting Provides procedures for running diagnostic or related routines for the LOGIQ A3 8 Chapter 8 Replacement Procedure...

Страница 31: ...and sterilization refer to Probe section in LOGIQ A3 User Manual and Caution Sheet supplied with each probe WARNING WARNINGCAREFULLY READ ALL OF THE WARNINGS BELOW NOTICE This medical equipment is approved in terms of the prevention of radio wave interference to be used in hospitals clinics and other institutions which are environmentally qualified The use of this equipment in an inappropriate env...

Страница 32: ...contained in a NOTE can often save your time or effort DANGER IS USED TO INDICATE THE PRESENCE OF A HAZARD THAT WILL CAUSE SEVERE PERSONAL INJURY OR DEATH IF THE INSTRUCTIONS ARE IGNORED WARNING IS USED TO INDICATE THE PRESENCE OF A HAZARD THAT CAN CAUSE SEVERE PERSONAL INJURY OR PROPERTY DAMAGE IF INSTRUCTIONS ARE IGNORED Caution is used to indicate the presence of a hazard that will or can cause...

Страница 33: ... of hazards that could cause harm Other hazard icons make you aware of specific procedures that should be followed Table 1 2 Standard Hazard Icons ELECTRICAL MECHANICAL RADIATION LASER HEAT Table 1 3 Standard Icons Indicating a Special Procedure Be Used AVOID STATIC ELECTRICITY TAG AND LOCK OUT WEAR EYE PROTECTION LASER LIGHT State RELEASE Docu m ent is released and u n der formal Change Control C...

Страница 34: ...ing applied part Probe connectors and PCG Connectors CAUTION This unit weighs Special care must be used to avoid This precaution is intended to prevent injury that may result if one person attempt to move the unit considerable distances or on an incline due to the weight of the unit On the console where easily seen during transport CAUTION The equilateral triangle is usually used in combination wi...

Страница 35: ...ices near this equipment Cellular phones radio transceivers mobile radio transmitters radio controlled toy etc Use of these devices could cause this equipment to perform outside the published specifications Keep power to these devices turned off when near this equipment Rear of console This Symbol indicates that waste electrical and electronic equipment must not be disposed of as unsorted municipa...

Страница 36: ...ucted to avoid overheating of the monitor WHEN THE UNIT IS RAISED FOR A REPAIR OR MOVED ALONG ANY INCLINE USE EXTREME CAUTION SINCE IT MAY BECOME UNSTABLE AND TIP OVER ULTRASOUND PROBES ARE HIGHLY SENSITIVE MEDICAL INSTRUMENTS THAT CAN EASILY BE DAMAGED BY IMPROPER HANDLING USE CARE WHEN HANDLING AND PROTECT FROM DAMAGE WHEN NOT IN USE DO NOT USE A DAMAGED OR DEFECTIVE PROBE FAILURE TO FOLLOW THES...

Страница 37: ...ponsible for ensuring that parts equipment have been properly decontaminated prior to shipment Under no circumstance should a part or equip ment with visible body fluids be taken or shipped from a clinic or site for example body coils or an ultrasound probe The purpose of the regulation is to protect employees in the transportation industry as well as the peo ple who will receive or open this pack...

Страница 38: ...rning Label Locations Figure 1 1 Label Location State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 38 of 252 ...

Страница 39: ...ocations continued Figure 1 2 Transport Label Figure 1 3 Gender Caution Label State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 39 of 252 ...

Страница 40: ...Locations continued Figure 1 4 Rating Plate Label State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 40 of 252 ...

Страница 41: ...Locations continued Figure 1 5 Caution Label Figure 1 6 EIAJ Label Japan Only State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 41 of 252 ...

Страница 42: ...ure 1 7 Gost Label Figure 1 8 TUV Label Figure 1 9 Circuit Breaker Label State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 42 of 252 ...

Страница 43: ...1 10 Circuit Breaker Panel Rating Label Figure 1 11 Front Panel Rating Label Figure 1 12 Grounding Label State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 43 of 252 ...

Страница 44: ...inued Figure 1 13 Mercury Label Figure 1 14 ROHS Label L 11 L 13 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 44 of 252 ...

Страница 45: ...nited States law restricts this device to sale or use by or on the order of a physicians U S A Only D9 The CE Mark of Conformity indicates this equipment conforms with the Council Directive 93 42 EEC D10 CISPR CAUTION The LOGIQ A3 conforms to the CISPR11 Group 1 Class A of the international standard for Electromagnetic disturbance characteristics D11 WEEE Label This symbol indicates that the waste...

Страница 46: ... electrostatic discharge radiated and conducted RF fields magnetic fields and power line transient requirements Applicable standards are 47CFR Part18 IEC EN 60601 1 2 NOTE For CE Compliance it is critical that all covers screws shielding gaskets mesh clamps are in good condition installed tightly without skew or stress Proper installation following all comments noted in this service manual is requ...

Страница 47: ... W Electric Avenue Milwaukee WI 53219 TEL 1 262 524 5300 TEL 1 262 524 5698 FAX 1 414 647 4125 ASIA Singapore Japan GE Ultrasound Asia Singapore Service Department Ultrasound 298 Tiong Bahru Road 15 01 06 Central Plaza Singapore 169730 TEL 65 291 8528 81 426 48 2950 FAX 65 272 3997 FAX 81 426 482902 81 426482944 ASIA China India Korea SEA Ultrasound Tech Support CHINA Ultrasound Tech Support INDIA...

Страница 48: ...PRO GE HEALTHCARE PVT LIMITED NO 4 KADUGODI INDUSTRIAL AREA BANGALORE KARNATAKA INDIA 560067 TEL 91 80 4180 1000 FAX 91 80 2845 2924 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 48 of 252 ...

Страница 49: ...ction 1 7 Customer Assistance State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 49 of 252 ...

Страница 50: ...facility and electrical needs to be met by the purchaser of the unit 2 1 2 Table Of Contents S No Description Page Number 1 Overview 2 1 2 General Console Requirements 2 2 3 Facility Needs 2 6 Table 2 1 Contents in Pre Installation State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the...

Страница 51: ...ted to minimize possible interference Table 2 2 Environmental Requirements for LOGIQ A3 Scanners Operation Storage Transport Temperature 10 40 degree C 50 104 degree F 10 60 degree C 14 140 degree F 40 60 degree C 40 140 degree F Humidity 30 85 non condensing 30 85 non condensing 30 85 non condensing Pressure 700 1060hPa 700 1060hPa 700 1060hPa Table 2 3 Environmental Requirements for an Ultrasoun...

Страница 52: ...t is recommended that the branch circuit breaker for the machine be ready accessible 2 2 3 3 Site Power Outlets A dedicated AC power outlet must be within reach of the unit without extension cords Other outlets adequate for the external peripherals medical and test equipment needed to support this unit must also be present within 1 m 3 2 ft of the unit Electrical installation must meet all current...

Страница 53: ...ce of a broadcast station or broadcast van may also cause interference See Table 2 5 for EMI Prevention tips EMI Rule Details Be aware of RF sources Keep the unit at least 5 meters or 15 feet away from other EMI sources Special shielding may be required to eliminate interference problems caused by high frequency high powered radio or video broadcast signals Ground the unit Poor grounding is the mo...

Страница 54: ...al cables Do not allow cables to lie across the top of the card cage or hang out of the peripheral bays Loop the excess length for peripheral cables inside the peripheral bays Attach the monitor cables to the frame ELECTRONIC Operation 10 to 40 degree C 50 to 104 degree F Storage 20 to 50 degree C 4 to 122 degree F Temperatures in degree C conversion to degree F degree C 9 5 32 Table 2 6 Operation...

Страница 55: ...referably prior to the purchase The ultrasound suite must be clean prior to delivery of the machine Carpets are not recommended because they collect dust and create static Potential sources of EMI electromagnetic interference should also be investigated before delivery Dirt static and EMI can negatively impact system reliability 2 3 2 Required Features NOTE GE Medical Systems requires a dedicated ...

Страница 56: ... Room Facilities Door is at least 92cm 3 ft wide Circuit breaker for dedicated power outlet is easily accessible Lab sink with hot and cold water Receptacle for bio hazardous waste like used probe sheaths Emergency oxygen supply Storage for linens and film Medical equipment storage Hospital grade equipment electrical outlet Nearby waiting room lavatory and dressing room Dual level lighting bright ...

Страница 57: ... Minimal Floor Plan Suggestion Figure 2 1 Minimal Floor Plan State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 57 of 252 ...

Страница 58: ... 1 2 Receiving and Unpacking LOGIQ A3 3 3 3 Safety Reminders 3 9 4 Moving into Position 3 10 5 Adjusting System Clock 3 10 6 Product Locator Installation Card 3 10 7 Preparing for Installation 3 11 8 Completing the Installation 3 12 9 System Configuration 3 18 10 Network Connectivity 3 19 11 Optional Peripherals 3 23 12 Connectivity Installation Worksheet 3 29 13 Paper work 3 37 State RELEASE Docu...

Страница 59: ...cking labels refer to LABELS ON PACKAGE 3 After being transported the unit may be very cold or hot If this is the case allow the unit to acclimate before you turn it on It requires one hour for each 2 5oC increment in it s temperature if it is below 10o C or above 40o C Table 3 2 Average Installation Time Description Average Installation Time Comments Unpacking the scanner Approximately 0 5 hour S...

Страница 60: ...advice you to store the LOGIQ A3 packing material in undamaged condition in case of future transportation CAUTION Do not lift the unit by the Keyboard This may cause equipment damage CAUTION The crate with the LOGIQ A3 weighs approximately 70 kg Be prepared for a sudden shift of weight as the unit is removed from its base pallet CAUTION Inspect the Shock watch and Tilt watch Ensure that they are n...

Страница 61: ...A3 cont d 1 Remove all the Metal locks to dismantle the plywood packing Figure 3 1 The metal bands to be removed State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 61 of 252 ...

Страница 62: ... A3 cont d 2 Lift the TOP Cover up and off Figure 3 2 Removing the top cover State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 62 of 252 ...

Страница 63: ...nd Unpacking LOGIQ A3 cont d 3 Remove the Front plywood Figure 3 3 Removing the front plywood State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 63 of 252 ...

Страница 64: ... the internal foams carefully 6 Place the top cover as shown in the figure 3 4 below to form the ramp to put the console down Figure 3 4 Position Top Cover State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 64 ...

Страница 65: ...nt castors then carefully put the console off the Palette 8 Remove the Plastic Wrapping around the LOGIQ A3 Figure 3 5 Moving the LOGIQ A3 from the crate State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 65 of...

Страница 66: ...o two prong adapter This defeats safety grounding CAUTION Do NOT wear the ESD wrist strap when you work on live circuits and more than 30 V peak is present CAUTION Do not operate this unit unless all board covers and frame panels are securely in place System performance and cooling require this CAUTION OPERATOR MANUAL S The User Manual s should be fully read and understood before operating the LOG...

Страница 67: ...adjusting the system clock refer to Software Configuration Checks in Chapter FUNCTIONAL CHECKS 3 2 4 Product Locator Installation Card Fill out proper customer Information on the Product Locator Installation Card Mail this Installation Card Product Locator to the address corresponding to your pole NOTE The Product Locator Installation Card shown may not be same as the provided Product Locator card...

Страница 68: ...MI Many of the covers shields and screws are provided primarily to protect the system from image artifacts caused by this interference For this reason it is imperative that all covers and hardware are installed and secured before the unit is put into operation 3 3 4 Checking the Components When a new system arrives check that nonne of the components are damaged or in short supply If shipping damag...

Страница 69: ... 12 The Size of LOGIQ A3 with monitor and peripherals is shown in Figure 3 7 on page 12 Note Tolerance of 1 5 cm Table 3 4 Physical Dimension of LOGIQ A3 Height Width Depth Unit 125 41 6 59 cm Figure 3 7 OVERALL DIMENSIONS 59cm 125 cm 41 6cm State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to det...

Страница 70: ...ptacle mating surface C Twist the transducer twist lock lever to the 2 o clock position to lock it in place Twist the lever to the 9 o clock position to disconnect the transducer NOTE It is not necessary to turn OFF power to connect or disconnect a transducer Connect the main power cable to a hospital grade power receptacle with the proper rated voltage checked during pre installation Never use a ...

Страница 71: ...receptacle with the proper rated voltage Never use an adapter that would defeat the safety ground 3 Switch ON the Circuit Breaker at the rear of the system A Circuit Breaker B Power cable When power is applied to the scanner and the rear Circuit Breaker is turned ON power is distributed to the Transformer Assembly Figure 3 8 Circuit Breaker and Power Cable on Back of Scanner A B State RELEASE Docu...

Страница 72: ...eripheral outlets and to the Master Board at Back End Master Board at Back End starts and the software is initiated to start the scanner No status messages are displayed during this process Figure 3 9 Power On Off Switch for Back end Processor Boot Up 1 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy ...

Страница 73: ...is completed when the control panel illumination shuts down 3 Disconnect the probes Clean or disinfect all probes as necessary Store them in their shipping cases to avoid damage 4 If daily maintenance is to be performed turn off the circuit breaker NOTE Do not pull the power cable without turning off the circuit breaker or 1 Press the Power On Off switch on the Control Panel and hold it till power...

Страница 74: ... 2 Disconnect the Mains Power Cable if necessary For example Relocating the scanner Figure 3 10 Circuit Breaker and Power Cable on Back of Scanner A B State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 74 of 25...

Страница 75: ...ilities to terminate the utility function NOTE After making changes reboot the system when message appears on the screen Table 3 1 System Configuration Configuration Category Description Settings Enables the user or service personnel to set the date time unit language basic information about the organization such as the institution name and department State RELEASE Docu m ent is released and u n d...

Страница 76: ...t the network connection for the system and connected remote PC to store images data The windows XP remote PC with Internet Information Services enabled should be required NOTE The remote PC with Windows XP Operating System should be required and also make sure Internet Information Services Installed on PC State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject...

Страница 77: ...llowing below steps 1 Select Start Control Panel Figure 3 1 Control Panel 2 Select Administrative Tools from control panel window Figure 3 2 Administrative Tools State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Pa...

Страница 78: ... site state as Running indicates that the system is ready for file transfer 5 Select the Network Connection from Control Panel to setup static IP Address From Network Connections select Local Area Network The Local Area Connection properties window displays on the screen Select Internet Protocol TCP IP Properties Select Use the following IP Address from Internet Protocol TCP IP properties State RE...

Страница 79: ...he IP Address acquire unique static IP address from hospital network administrator for e g 3 245 71 170 Subnet Mask as 255 255 255 0 and Default Gateway if applicable Enable DHCP the system acquires dynamic IP Address from DHCP server D In the External Host section type the IP Address acquire unique static IP address from hospital network administrator for e g 3 245 71 173 E On pressing Ping butto...

Страница 80: ...tructions for installation and connection procedures Table 3 1 STORAGE AND OPERATION REQUIREMENTS Parameter Storage Operation Temperature Deg C Deg F 10 to 60 14 to 140 10 to 40 50 to 104 Atmospheric Pressure hPa 700 to 1060 700 to 1060 Humidly non condensing 30 to 85 30 to 85 Table 3 2 List of Recording Devices Device Manufacturer Model Catalog Number Video Signal B W Video Printer SONY UP 897MDW...

Страница 81: ...ONNECTING CABLES Name Part No Figure NOTE Power Cable P9509EE Use only approved IEC Couplers for peripherals connection to System Rear panel P9509MH Used only for installing Peripherals on front panel of the console Mini Plug Cable P9509BE For control signals used only for B W video printer Table 3 5 Power Consumption of Optional Recording Devices Device Manufacturer Model Power Consumption VA B W...

Страница 82: ...d by connecting to the LOGIQ A3 Rear panel The Rear Panel of LOGIQ A3 Consists of following connectors to connect peripherals 1 BNC Connectors 2 SVideo Out 3 Ethernet 4 USB Ports Table 3 6 LIST OF TRANSDUCERS Probe Name Material of Headshell Area of Using TYPE Catalog Number Part Number 4C PES Abdomen OB GYN Urology Convex H4904PC 5123455 3S NORYL Cardiac Sector H4550SZ 2323337 8L NORYL Small Part...

Страница 83: ...3 8 4 pin mini DIN 2 VGA Out Table 3 9 DSUB HD22 15 Pin female 3 Composite Video Out Table 3 10 BNC Connector Color Output 4 USB Table 3 12 5 Ethernet Network Connectivity Table 3 7 External I O Connector Descriptions State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of th...

Страница 84: ...Chroma SIGNAL Table 3 9 VGA Connector Shrinked Sub D 15 Pin Pin No Output Signal Description Picture 1 VGA OUT1 R Red 2 VGA OUT1 G Green 3 VGA OUT1 B Blue 4 9 11 12 15 N C N C 5 6 7 8 10 GND GND 13 VGA OUT1 HS H Sync 14 VGA OUT1 VS V Sync Table 3 10 Composite Video Out Pin No Output Signal Description Picture 1 Composite Video BNC Connector Color Output 2 GND GND 3 GND GND 2 3 1 State RELEASE Docu...

Страница 85: ... of USB1 USB2Connector USB Pin No Signal Pin No Signal Picture 1 5 VDC 3 DATA 2 DATA 4 GND Table 3 11 Pin Assignments of USB USB State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 85 of 252 ...

Страница 86: ... and user information is available during the operation and service of the complete system 3 9 1 Product Locator Installation NOTE The Product Locator Installation Card shown may not be same as the provided Product Locator card Figure 3 1 Product Locator Installation Card State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEH...

Страница 87: ...rrect User Manual s for the system and software revision is included with the installation Specific language versions of the User Manual may also be available Check with your GE Sales Representative for availability Figure 3 12 GE CARES Sticker Location State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy ...

Страница 88: ...age Number 1 Overview 4 1 2 Required Equipment 4 1 3 General Procedure 4 2 4 Functional Checks 4 3 5 Software Configuration Checks 4 11 6 Peripheral Checks 4 11 7 Safety Issues 4 13 8 Site Log 4 14 NOTICE Most of the information pertaining to this Functional Checks chapter is found in the LOGIQ A3 Basic User Manual Direction number 5191391 100 Look for the letters BUM after a section in the Table ...

Страница 89: ...quirements For USA Europe Only Follow OSHA Lockout Tagout requirements by ensuring you are in total control of the plug CAUTION SYSTEM REQUIRES ALL COVERS Operate this unit only when all board covers and frame panels are securely in place The covers are required for safe operation good system performance and cooling purposes NOTICE Lockout Tagout Requirements For USA only Follow OSHA Lockout Tagou...

Страница 90: ...Patient Enter Patient Demographic data screen B Mode Scan Returns machine to scanning state and select scan mode Report Activates default report and touch screen of report choices Utility Activates the machine s configuration Probe Activates probe selection menu State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o r...

Страница 91: ...probe connector 2 Turn ON the scanner if it isn t turned on already 3 Perform the Screw driver Test on the system to ensure that that B mode image is fine Figure 4 1 LOGIQ A3 B Mode Controls State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Docu...

Страница 92: ...cation of the focal point s A triangular focus marker indicates the depth of the focal point 8 Reverse Toggles the left right orientation of the scan image 9 Harmonics Activate Tissue Harmonics Diminishes low frequency high amplitude noise and improves imaging Enhances near field resolution for improved small parts imaging as well as far field penetration Press Harmonics Key to activate 10 Dynamic...

Страница 93: ...obe of Chapter Installation to the system probe connector 2 Turn ON the scanner if it isn t turned on already Figure 4 2 Controls available in M Mode State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 93 of 252...

Страница 94: ...Displays the M Mode cursor on the B Mode image Press M D Cursor and Trackball to position M Mode Cursor Table 4 7 M Mode Top and Sub Menu Controls Step Task Expected Result s 1 Sweep Speed Changes the speed at which timeline is swept Rotate Sweep Speed left right to increase decrease the value 2 Rejection Affects border sharpness 3 MGrey Map Image brightness will be adjusted as per grey map select...

Страница 95: ...he current exam category is displayed on the Monitor Select the appropriate exam category and measurement kind 4 Trackball the cursor Move the cursor to the start point of the measurement 5 Press Set Anchor the start point of the measurement 6 Trackball the cursor Move the cursor to the measurement end point The current distance value is displayed in the Measurement result table and is instantaneo...

Страница 96: ...aliper displays 2 To position the active caliper move the TRACKBALL 3 To fix the start point press SET The system fixes the first caliper and displays a second active caliper 4 To position the second caliper move the TRACKBALL 5 Turn the ELLIPSE control an ellipse with an initial circle shape appears NOTE Be careful not to press the Ellipse control as this activates the Body Pattern 6 To position ...

Страница 97: ...eactivating the probe the probe is automatically placed in standby mode 1 Press the Freeze key 2 Gently wipe the excess gel from the face of the probe Refer to the Basic User Manual for complete probe cleaning instructions 3 Carefully slide the probe around the right side of the keyboard toward the probe holder Ensure that the probe is placed gently in the probe holder 4 4 6 3 Disconnecting the pr...

Страница 98: ...Date and Time are correct Adjust the Date and Time setting 2 Check that Location Hospital Name and Department is correct Location Name is correct Re enter the correct Location Name 3 Check Language setting Language is proper Set the proper Language 4 Check Units setting Units are proper Set the local units 5 Check assignment of Printer Keys Print1 2 Keys are assigned as desired by the customer 6 C...

Страница 99: ...ort 4 Switch ON the system and allow it to boot The system copies the Imaging Presets onto the Memory stick Rename the file on Memory stick unopresetbackup as unopresetbackup_ to have a backup before restoring in to the system 4 6 2 Presets Restore 1 Create a file unopresetbackup as unopresetrestore onto memory stick 2 Switch Off the system and insert memory stick on top panel memory port 3 Switch...

Страница 100: ...nto place Rotate the locking handle to the full vertical position to lock in place Position the probe cable so that it is not resting on the floor CAUTION Do not allow the probe head to hang freely Impact to the probe head may result in irrepairable damage Able to connect a probe 4 Press the Probe key available on the control panel to activate second probe connected Second probe details loaded on ...

Страница 101: ... Log Table 4 12 Site Log Date Service person Problem Comments State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 101 of 252 ...

Страница 102: ...is page was intentionally left blank State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 102 of 252 ...

Страница 103: ...16 Section 4 8 Site Log State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 103 of 252 ...

Страница 104: ...o the Front End to the Mid Processors and Back End Processor and finally to the monitor and peripherals 5 1 3 System Features The key design goals of this system are High Image Quality Increased User Productivity Multiple Clinical Applications High Mobility Table 5 1 Table Of Contents for this chapter S No Description Page Number 1 Overview 5 1 2 Block Diagrams and Theory 5 3 3 Front End 5 4 4 Bac...

Страница 105: ...gnal processing section a digital signal processing section and the microprocessor driven system control section which controls the system based on operator commands and system status information Figure 5 1 LOGIQ A3 Major Components 1 Handler 6 Circuit Breaker 11 Two Probe Port 2 VGA Connector 7 USB Ports 12 CD Drive 3 BNC Connectors 8 Monitor 13 Probe Holder 4 Video Connectors 9 USB Port 14 Gel H...

Страница 106: ...d Theory 5 2 1 Block Diagram Figure 5 2 LOGIQ A3 Block Diagram State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 106 of 252 ...

Страница 107: ...tor Board 5 2 2 1 Transmit Receive PCB TxRx TxRx includes 48 channel transmit and receive circuits in a single board This board is mainly divided in to five sections 1 Three 16 channel transmit pulse generators 2 48 High voltage transmit drivers 3 Six octal voltage control attenuator gain amplifier 4 Six Octal high speed analog to digital converter 5 Three 16 channel receive delay summer State REL...

Страница 108: ...cludes a FPGA to generate the HV switch programming data that will steer the TxRx signals to the correct probe elements FPGA has following read write registers to interface with the master controller board MST Read registers from connector board 1 creg0 at address X03H is temp 7 0 2 creg1 at address x04H is temp 15 8 3 creg2 at address x05 is connector board revision number 4 creg3 at address x06 ...

Страница 109: ...ads the DPRAM values and updates the ASIC with the new set of data Control FPGA generates the necessary signals required to meet the timing specs for the Asic MST Control FPGA interfaces with Connector Board FPGA with predefined protocol DSP updates on probe change request and HV mux start element values are written from control fpga to connector board fpga every trig Connector board FPGA in turn ...

Страница 110: ...for power supply and control inputs and outputs Trx to MST connection is through 140 pin connectors State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 110 of 252 ...

Страница 111: ...r supply through BPB 5V 10mAmp 5 12VA 20mAmp 5 SHV TBD 80V SHV TBD 80V TxRx Board 5V 1 3Amp 5 Directly from integrated power supply through BPB 3 3V 2Amp 5 12VA 250mAmp 5 THV TBD 2 5V to 60V THV TBD 2 5V to 60V MST Board 3 3V 2Amp 5 Directly from integrated power supply through BPB 5V 450mAmp 5 5V 140mAmp 5 12VA 90mAmp 5 FAN 12VA 400mAmp 5 Directly from integrated power supply through BPB USB HDD ...

Страница 112: ... from MST board and terminated to a VGA connector with suitable ESD protection The composite video signals input and output video signals routed to this board from MST board and terminated to the respective connectors with suitable ESD protection The S video signals input and output video signals routed from the MST board and terminated to the respective connectors with suitable ESD protection The...

Страница 113: ...period will be controlled based on the Hex value set from the Host side LED should be of High Luminescence type and shall consume less power 4 Encoder interface The phase quadrature output of encoder will be connected to CPLD or micro controller interrupt pin The de bouncing of the signal needs to be done 4or 8 bit counter will be updated depending on the direction of rotation The encoder switches...

Страница 114: ...old LED for power signal indication and 3 switches for menu driven control of video LCD parameters It is required to house all these in a metallic structure for strength and EMI protection Following figure shows the functional block diagram of the LCD monitor There are two additional PCB s inside the LCD housing PCB 1 and PCB2 PCB 1 This board shall incorporate 1 LED and 3 tactile push button keys...

Страница 115: ...2 7 1 Brightness adjustment There shall be provision to set the brightness level of the LCD panel There is a 16 steps 0 15 to vary this brightness level linearly from 0 to 100 Section 5 3Circuit Boards Descriptions The following table lists circuit boards and their respective card cage slot assignments on the mother board of the LOGIQ A3 system Table 7 Condition LED status 1 Power Off LED off 2 Po...

Страница 116: ...s the flow chart that explains the signal flow during the system ON OFF State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 116 of 252 ...

Страница 117: ...ction 5 4 ON OFF Signal Flow State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 117 of 252 ...

Страница 118: ...tion 6 2Regulatory Verify where applicable that any regulatory information or tests required by national law are present and accounted for and any regulatory tests required by national law are performed and documented S No Description Page Number 1 Overview 6 1 2 Regulatory 6 1 3 Monitor Adjustment 6 2 Table 6 1 Chapter 6 Contents State RELEASE Docu m ent is released and u n der formal Change Cont...

Страница 119: ...n on a slide bar on the screen Refer the following table for the setting Record the final brightness and contrast settings and leave this information with the system Generally speaking do not change the controls once they have been set the display becomes the reference for the hard copy device s After readjusting the monitor s Contrast and Brightness readjust all preset and peripheral settings Fig...

Страница 120: ...ome tests may be optional they should only be performed by qualified personnel 7 1 2 Table Of Contents Table 7 1 Chapter 7 Contents S No Description Page Number 1 Overview 7 1 2 LED Descriptions 7 2 3 Voltage Testing 7 7 4 Troubleshooting Tips 7 8 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem ...

Страница 121: ... 1 TxRx Board LED DESCRIPTION STATE DS1 Indicates Trig ON DS2 indicates on board generated voltage 1 8V ON OK DS3 Not Used OFF Table 7 2 TxRx LED Descriptions DS 1 DS 3 DS 2 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100T...

Страница 122: ...1 5V ON OK LED7 indicates on board generated voltage 1 8V ON OK LED8 indicates on board generated voltage 1 2V volts ON OK LED9 Not Used OFF LED10 Not Used OFF LED 9 LED 10 LED 7 LED 8 LED 3 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Docu...

Страница 123: ...D2 indicates on board generated voltage 12VA ON OK LED3 indicates on board generated voltage 3 3VD ON OK LED4 indicates on board generated voltage 5V ON OK LED 1 LED 2 LED 3 LED 4 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 521332...

Страница 124: ...T 1 ON DS2 Will be ON while Configuring FPGA and Turned OFF during Functionality OFF ON FPGA Not Configured DS3 Trig LED ON DS 0 DS 1 DS 2 DS 3 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 124 of 252 ...

Страница 125: ...Panel LED DESCRIPTION STATE D1 Interlock ON OK D2 PIF ON OK D3 MST ONOK D4 KBD ON OK D5 TxRx ON OK D6 DIF ON OK State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 125 of 252 ...

Страница 126: ... 3 2 BPB Board The following Low Voltage Testing points available on BPB Board 1 THV 2 THV 3 SHV 4 SHV 5 12 Volts 6 5 Volts 7 5 Volts 8 Ground 9 3 3 Volts Figure 7 5 BPB Testing Points State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5...

Страница 127: ...eplace MST 5 Probe Not Recognised Probe Loose Connection Restore Loose Connections CNB Failure Replace CNB MST Failure Replace MST 6 No Image CNB Failure Replace CNB TxRx Failure Replace TxRx DIF Failure Replace DIF MST Failure Replace MST 7 Peripherals Power Supply from System Absent Fuse Failure Transformer Failure Replace Transformer 8 Unable to Print MST Failure Replace MST 9 Unable to archive...

Страница 128: ...eshooting Guide 7 5 1 Probe not getting recognized State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 128 of 252 ...

Страница 129: ...assword Run All board Tests Is Defective identified Replace the identified defective board CON TxRx Y Check and confirm about presence of HV symptom on Image near field Also check error and event logs for the HV voltages N Is HV symptom available Check and Replace the HV board N Y Confirm all boards including Digital Interface board are properly connected If issue persists replace TxRx and MST boa...

Страница 130: ...er7 7 11 7 5 3 No Display State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 130 of 252 ...

Страница 131: ...leshooting Guide 7 5 4 System does not Boot State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 131 of 252 ...

Страница 132: ...3 7 5 5 System does not switch ON State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 132 of 252 ...

Страница 133: ...ide 7 5 6 Unable to Print on the Printers UPD897 Deskjet State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 133 of 252 ...

Страница 134: ... 15 7 5 7 No Keyboard response State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 134 of 252 ...

Страница 135: ...ooting Guide 7 5 8 No Image on External Monitor State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 135 of 252 ...

Страница 136: ...n the Transformer module are not blown off Replace Transformer Module if it is blown off Check the Front Panel cable from Transformer Module to the front panel Check and ensure the SSR relay is not defective Replace if found defective State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine ...

Страница 137: ...oting Guide 7 5 10 Unable to Archive and Backup State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 137 of 252 ...

Страница 138: ... 7 19 7 5 11 TGC malfunction State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 138 of 252 ...

Страница 139: ...bleshooting Guide 7 5 12 Gain malfunction State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 139 of 252 ...

Страница 140: ...nd defective Enter Service Diagnostics from Utility screen Enter login id and password Run Keyboard Tests Check all Keyboard Tests including Trackball tests Checkand replace the entire Keyboard Asm State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approv...

Страница 141: ...gure 7 6 Utility button on keyboard 2 Following Screen will appear Refer Figure 7 2 below Figure 7 7 System Settings Click on Run System Diagnostics The login screen will appear Refer Figure 7 3 below State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent App...

Страница 142: ...board Test 3 LCD Test To perform the Display Tests 4 Error Logs To view the Errors occurred in the system 5 Event Logs To view the Event Logs 6 Copy to USB To copy the Log files to USB 7 Copy to CD To copy the Log files to CD 8 Return Return to the main Utility screen NOTE For all kind of Tests If Indicator is Red Test is failed and you may see Error Logs If indicator is Green Test is passed and a...

Страница 143: ...st button Refer figure 7 5 on Service Diagnostics main screen The test will be performed and result will be displayed on corresponding Indicators Figure 7 10 Start Test a Click Here to start the Con Trx and Mst tests State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of thi...

Страница 144: ...e 7 12 Keyboard test screen Press each of the key on the Keyboard As you press each key corresponding keys will disappear from the screen Press Return key to return to Service Diagnostics main Screen Keyboard test result would be displayed on the indicator above the Keyboard Test Button State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Proc...

Страница 145: ...gure 7 14 Patterns test screen Click on each of the button on the left Panel to test the different pattern colors Click Return to return to the Service Diagnostics main Screen Result will be displayed as indicator above the Display Test button on the service dianostics main screen State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process Se...

Страница 146: ...screen Following screen will appear Refer Figure 7 11 Screen will consists of Event No Event Description Event Date Time and Parameter Figure 7 16 Event logs screen Click return key to return to Service Diagnostics main Screen State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the stat...

Страница 147: ...ere to invoke Error Logs Error Log Screen Consists of Error Name Error Description Error Date and Time columns Refer figure 7 13 Figure 7 18 Error Log screen Click return Button to return to Service Diagnostics main Screen State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s ...

Страница 148: ...pied to CD Figure 7 19 Copy to CD 7 Copy To USB Put USB onto USB driver Click the Copy to USB button Refer figure 7 15 from Service Diagnostics main Screen Log files will be copied to USB Figure 7 20 Copy to USB State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this doc...

Страница 149: ...agnostics This page was intentionally left blank State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 149 of 252 ...

Страница 150: ...ill receive or open this package NOTE The US Department of Transportation DOT has ruled that items that were saturated and or dripping with human blood that are now caked with dried blood or which were used or intended for use in patient care are regulated medical waste for transportation purposes and must be transported as a hazardous material WARNING WARNING ONLY QUALIFIED SERVICE PERSONNEL SHOU...

Страница 151: ... 1 Flip down the LCD Monitor 2 Unscrew the two screws 5 6 and remove LCD arm cover Refer Figure 8 1 on page 8 2 Figure 8 1 LCD Rear Cover 3 Unscrew the four screws 1 2 3 4 to remove LCD Rear Cover Refer Figure 8 1 on page 8 2 4 Unfasten the cable clamp for Power and Signal cables and disconnect the cable connection to the LCD Figure 8 2 Remove Cables 1 2 3 4 5 6 LCD Rear Cover LCD Arm Rear Cover S...

Страница 152: ... on page 8 2 3 Put back LCD arm cover and fix the two screws 5 6 Refer Figure 8 1 on page 8 2 4 Replace LCD rear cover by fixing the four screws 1 2 3 and 4 Refer Figure 8 1 on page 8 2 8 2 1 6 Functional Checkout Procedure See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 2 1 Equipment passes all required ...

Страница 153: ... Remove Keyboard Assembly 2 Remove Keyboard rearcover by unfastening the 2 screws holding it 3 Remove LCD Arm Rear Cover assy 4 Remove Monitor Neck Cover by removing the 4 screws holding it and disconnect the USB cable from inside Figure 8 4 LCD Arm Rear Cover and Monitor Neck Cover LCD Arm Rear Cover Monitor Neck Cover State RELEASE Docu m ent is released and u n der formal Change Control Changes...

Страница 154: ...ection 8 2 2 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 Peripheral Checks Section 7 6 Service Diagnostics Keyboard Rear Cover State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determin...

Страница 155: ...ing the allen key set remove Handle A3 Console by unfastening the 4 socket head fasteners marked A B C D Figure 8 6 Handle A3 Console 8 2 3 5 Functional Checkout Procedure See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 2 3 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls A B ...

Страница 156: ...e of the system 8 2 4 4 Removal procedure 1 Remove Monitor Neck cover 2 Remove LCD assembly 3 Unfasten the Locking screw using a standard flat screwdriver 4 Remove LCD Arm 5 Remove spacer sheet 6 Using the allen key set unfasten the 3 sockethead screws to remove the Monitor Holder Monitor Holder LCD Arm inside State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ...

Страница 157: ...Direction 5213326 100 Rev 3 Section 8 2 4 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 52...

Страница 158: ... Preparations Shutdown the system and switch off the main Circuit Breaker at the bottom rear side of the system 8 3 1 4 Removal Procedure 1 Remove the Gel Holder and Probe Holders Figure 8 7 Key Board Top View Gel Holder Probe Holders State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine ...

Страница 159: ... Replace Keyboard Assembly 1 Connect keyboard cable to the new Keyboard Assembly 2 Locate the Keyboard top hinge appropriately 3 Replace keyboard Assembly by fixing four screws a b c and d 4 Refix Gel holder and Probe holders a b c d Keyboard cable State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem...

Страница 160: ...n 8 3 1 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 Peripheral Checks Section 7 6 Service Diagnostics State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this doc...

Страница 161: ...the bottom rear side of the system 8 3 2 4 Removal procedure 1 Remove keyboard Assembly 2 Remove TGC Caps 6 Nos 3 Remove TGC assembly by removing the 4 screws as marked in figure 4 10 PWA with TGC interface cable Figure 8 10 TGC Assembly TGC Assembly TGC I F Cable State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o...

Страница 162: ...n 8 3 2 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 Peripheral Checks Section 7 6 Service Diagnostics State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this doc...

Страница 163: ... unfastening the 10 screws marked in cyan color in Figure 4 11 holding it Figure 8 11 A N Keyboard PCB 8 3 3 5 Functional Checkout Procedure See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 3 3 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Ch...

Страница 164: ...ckball Interface cable Figure 8 12 Optical Trackball Assembly 8 3 4 5 Functional Checkout Procedure See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 3 4 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 ...

Страница 165: ...er at the bottom rear side of the system 8 3 5 4 Removal procedure 1 Remove Keyboard assembly 2 Remove all knobs on the keyboard 3 Remove the Alphanumeric keyboard TGC PCB and Trackball 4 Using a plier remove the nut holding the encoder PCBs on the rear side State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rksho...

Страница 166: ...ection 8 2 5 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 Peripheral Checks Section 7 6 Service Diagnostics A N Keyboard State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the s...

Страница 167: ...LH Cover and RH Cover 2 Remove Left EMI Cover 3 Disconnect the Keyboard cable from BPB 4 Remove Left right arm rear covers 5 Remove Top Cover plastic by unfastening the 2 screws holding it 6 Cut the tie wraps in the arm cover 7 Remove keyboard back cover assembly 8 Remove Keyboard Assembly 9 Pull the Keyboard interface cable from the back side State RELEASE Docu m ent is released and u n der forma...

Страница 168: ...eyboard Interface cable Keyboard Interface Cable State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 168 of 252 ...

Страница 169: ...3 Keyboard Figure 8 15 Cable routing State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 169 of 252 ...

Страница 170: ...326 100 Rev 3 Section 8 3 6 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 Peripheral Checks Section 7 6 Service Diagnostics State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the...

Страница 171: ...t Breaker at the bottom rear side of the system 8 3 7 4 Removal procedure 1 Remove Keyboard rear cover 2 Remove CD tray assembly 3 Remove Keyboard assembly 4 Remove Keyboard rubber bumper 5 Remove keyboard bottom cover Figure 8 17 Keyboard Rubber Bumper State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy ...

Страница 172: ...Section 8 3 7 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 Peripheral Checks Section 7 6 Service Diagnostics Keyboard Rear Cover State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determi...

Страница 173: ...and switch off the main Circuit Breaker at the bottom rear side of the system 8 3 8 4 Removal procedure 1 Pull the knobs out with hands by slightly pushing it up from the bottom edge Figure 8 19 Keyboard Knob Set TGC Knobs State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s ...

Страница 174: ...n 8 3 8 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 Peripheral Checks Section 7 6 Service Diagnostics State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this doc...

Страница 175: ...w the two screws 1 2 2 Remove the Right cover in the direction as shown in the figure below Figure 8 20 Right Cover 8 4 1 5 Functional Checkout Procedure See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 4 1 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 ...

Страница 176: ... Remove the Left cover in the direction as shown in the figure below Figure 8 21 Left Cover 8 4 2 5 Functional Checkout Procedure See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 4 2 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks a b St...

Страница 177: ...ow to remove Right cover 2 Remove Left cover Refer 8 4 2 on page 8 27 for details on how to remove Left cover 3 Remove the Rear Cover Figure 8 22 Rear Cover 8 4 3 5 Functional Checkout Procedure See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 4 3 Equipment passes all required tests and is ready for use 4 ...

Страница 178: ...e Left cover Refer 8 4 2 on page 8 27 for details on how to remove Left cover 3 Loosen the four screws a b c d 4 Remove the front cover 8 4 4 5 Functional Checkout Procedure Figure 8 23 Front Cover See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 4 4 Equipment passes all required tests and is ready for use...

Страница 179: ...er by unfastening the 2 screws marked in Figure 8 24 holding it Figure 8 24 Top Cover 8 4 5 5 Functional Checkout Procedure See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 4 5 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks Top Cover St...

Страница 180: ...asteners for the rear arm covers Figure 8 25 Arm Covers 8 4 6 5 Functional Checkout Procedure See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 4 6 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks RH Arm Cover LH Arm Cover State RELEASE Do...

Страница 181: ...itch off the main Circuit Breaker at the bottom rear side of the system 8 4 7 4 Removal Procedure 1 Remove front cover 2 Remove printer tray and CD tray assembly 3 Remove Monitor Neck Cover 4 Remove Keyboard bottom cover 5 Remove Probe cable hanger if available 6 Remove Left Right arm cover State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO ...

Страница 182: ...6 LH Cover with GE Logo LH Cover with GE logo State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 182 of 252 ...

Страница 183: ... Service Manual Direction 5213326 100 Rev 3 Section 8 4 7 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks RH Arm Cover with GE Logo State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Ap...

Страница 184: ... remove Front Cover 2 Remove the two screws marked 1 2 in Figure 8 28 3 Remove Front Bumper 8 4 8 5 Functional Checkout Procedure Figure 8 28 Removing Front Bumper See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On Boot Up Service Manual Direction 5213326 100 Rev 3 Section 8 4 8 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode...

Страница 185: ... of the system 8 4 9 4 Removal Procedure 1 Remove Front Bumper 2 Remove the Transformer assy 3 Lift the system slightly up on the side of the castor wheel that needs replacement 4 Place a small block of the size of castor wheel to balance the system 5 Using the allen key set unfasten the 4 Hex screws holding the Castor wheel and remove it State RELEASE Docu m ent is released and u n der formal Cha...

Страница 186: ...e Manual Direction 5213326 100 Rev 3 Section 8 4 9 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Do...

Страница 187: ...utdown the system and switch off the main Circuit Breaker at the bottom rear side of the system 8 4 10 4 Removal Procedure 1 Remove Right Cover Refer 8 4 1 on page 8 26 for details on how to remove Right cover 2 Loose the six screws A F 3 Remove the Right EMI Cover Figure 8 30 Removing Right EMI Cover A B C D E F State RELEASE Docu m ent is released and u n der formal Change Control Changes are su...

Страница 188: ...n the system and switch off the main Circuit Breaker at the bottom rear side of the system 8 4 11 4 Removal Procedure 1 Remove Left Cover Refer 8 4 2 on page 8 27 for detials on how to remove left cover 2 Loose six screws 1 6 3 Remove the Left EMI Cover Figure 8 31 Removing Left EMI Cover 1 2 3 4 5 6 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to th...

Страница 189: ...rcuit Breaker at the bottom rear side of the system 8 4 12 4 Removal Procedure 1 Remove Right EMI Cover Refer 8 4 10 on page 8 38 for details on how to remove Right EMI cover 2 Unscrew sixscrews 1 6 holding the Card cage EMI Cover Figure 8 33 Card Cage Left EMI Cover 4 Remove the Card Cage EMI Cover Figure 8 32 Nest EMI Cover 1 2 3 4 5 6 Rear EMI Cover P N 5196547 State RELEASE Docu m ent is relea...

Страница 190: ... cover 3 Remove Front Cover Refer 8 4 4 on page 8 29 for details on how to remove front cover 4 Remove Front Bumper Refer 8 4 8 on page 8 35 for details on how to remove front bumper 5 Unscrew the four screws 1 4 6 Remove Front EMI Cover 8 4 13 5 Functional Checkout Procedure Figure 8 34 Removing Conn EMI Cover Assy See Section Functional and or Leakage Current Test Debrief Script 4 3 1 Power On B...

Страница 191: ...at the bottom rear side of the system 8 4 14 4 Removal Procedure 1 Remove the Right Cover Refer to section 8 4 1 on page 8 26 2 Remove the Right EMI Cover Refer to section 8 4 10 on page 8 38 3 Disconnect the Fan Assembly cable from the backplane 4 Remove SSR cables on FAN Assembly Figure 8 35 Removing Fan cable Open here Open here State RELEASE Docu m ent is released and u n der formal Change Con...

Страница 192: ...anual Direction 5213326 100 Rev 3 Section 8 4 14 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 Peripheral Checks Section 7 6 Service Diagnostics a b State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop ...

Страница 193: ...em and switch off the main Circuit Breaker at the bottom rear side of the system 8 5 1 4 Removal Procedure 1 Remove the Rear Cover Refer to section 8 4 3 on page 8 28 2 Unscrew the four screws a b c d 3 Pull out the Rear panel assy by holding in the slot Figure 8 37 Removing Rear Panel Assembly a b c d Rear Panel Assm 1 State RELEASE Docu m ent is released and u n der formal Change Control Changes...

Страница 194: ... 8 4 14 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check Section 4 5 Peripheral Checks Section 7 6 Service Diagnostics State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this doc...

Страница 195: ... travel 8 5 1 9 Preparations Shutdown the system and switch off the main Circuit Breaker at the bottom rear side of the system 8 5 1 10 Removal Procedure 1 Unscrew two screws a b marked in Figure 8 38 and pull down the Front panel assy Figure 8 38 Removing Front Panel Assembly a b State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process Se...

Страница 196: ...ction 5213326 100 Rev 3 Section 8 5 2 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check 4 4 10 S W Config Checks Section 4 5 Peripheral Checks 4 4 6 Probe Connector Check Section 7 6 Service Diagnostics State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR E...

Страница 197: ...ws of transformer 3 Disconnect J4 from TRX 4 Remove LH and RH EMI Covers 5 Remove Card Cage EMI Cover 6 Slide out the HVLV and disconnect the power input cable for HVLV 7 Remove SSR by removing 2 fasteners and disconnect cable from fan assy 8 Remove the cable from all the cable clamps 9 Remove the Top Cover 10 Cut the required cable ties 11 Remove Keyboard Rear Cover 12 Remove front panel 13 Remov...

Страница 198: ... TRX Remove this connector from Transformer assm State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 198 of 252 ...

Страница 199: ...1 Cable routing Figure 8 42 SSR Remove Cables from these clamps State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 199 of 252 ...

Страница 200: ...re 8 43 Connector Remove this connector State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 200 of 252 ...

Страница 201: ...B terminals Figure 8 45 Grounding Cables Remove these USB terminals State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 201 of 252 ...

Страница 202: ...ment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check 4 4 10 S W Config Checks Section 4 5 Peripheral Checks 4 7 1 Probe Connector Check Section 7 6 Service Diagnostics State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s ...

Страница 203: ...e of the system 8 5 3 4 Removal Procedure 1 Remove Top Cover plastic 2 Remove front panel and disconnect two USB cable 3 Disconnect the top panel USB cable 4 Remove CD tray and disconnect the USB cable Only if CD ROM Option is integrated 5 Disconnect the USB cables from the BackPlane Board State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO P...

Страница 204: ...le assy Figure 8 47 Fan USB cables at BPB Backplane Remove the Fan USB cables at these connections on the BPB State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 204 of 252 ...

Страница 205: ...rfaces Figure 8 48 Cable Routing Cable Routing State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 205 of 252 ...

Страница 206: ...l required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check 4 4 10 S W Config Checks Section 4 5 Peripheral Checks 4 7 1 Probe Connector Check Section 7 6 Service Diagnostics State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determi...

Страница 207: ...r to 8 4 12 on page 8 40 4 Remove DIF Board 5 Move the upper and lower board ejector in the direction indicated by the arrow 1 in Figure B 6 For HVLV power supply disconnect the power cable connected to it CAUTION An electronic discharge may damage a component Turn OFF power and wear the wrist strap before you remove circuit boards Do not unplug the power cord to keep ground continuity Do not bend...

Страница 208: ...t passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check 4 4 10 S W Config Checks Section 4 5 Peripheral Checks 4 7 1 Probe Connector Check Section 7 6 Service Diagnostics Figure B TxRx HVLV SLOT BOARD FRU NO 1 TxRx 5184762 2 MST 5268149 DIF 5264760 3 HVLV 5165083 MST DIF State RELEASE Docu m ent is released and u n der f...

Страница 209: ...for details on how to remove front cover 4 Remove Front EMI Cover Refer 8 4 13 on page 8 41 for details on how to remove front EMI cover 5 Unscrew the four screws 1 4 from the connector board 6 Disconnect the connector board assembly CAUTION An electronic discharge may damage a component Turn OFF power and wear the wrist strap before you remove circuit boards Do not unplug the power cord to keep g...

Страница 210: ...l required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check 4 4 10 S W Config Checks Section 4 5 Peripheral Checks 4 7 1 Probe Connector Check Section 7 6 Service Diagnostics State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determi...

Страница 211: ...sconnect all the cables connected to back plane board CAUTION An electronic discharge may damage a component Turn OFF power and wear the wrist strap before you remove circuit boards Do not unplug the power cord to keep ground continuity Do not bend or flex the boards when mounting dismounting each boards Surface mount IC boards are very susceptible to damage from flex torque Figure 8 51 Disconnect...

Страница 212: ...00 Rev 3 Section 8 6 3 Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check 4 4 10 S W Config Checks Section 4 5 Peripheral Checks 4 7 1 Probe Connector Check Section 7 6 Service Diagnostics 1 2 3 4 5 6 7 8 9 10 11 12 13 14 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b...

Страница 213: ...crews a b 3 Remove GND cable which ever connected near to a 4 Pull out the transformer tray so the connector marked J4 is accessible and disconnect Cable J4TRx CAUTION Do not wear the ESD wrist strap when you remove a part of power supply unit Turn OFF power and unplug the power cord before removing a part of power supply unit However be sure to turn off power and wear the strap before you remove ...

Страница 214: ...e and meets allowable limits Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check 4 4 10 S W Config Checks Section 4 5 Peripheral Checks 4 7 1 Probe Connector Check Section 7 6 Service Diagnostics 10 6 5 Chassis Leakage Current State RELEASE Docu m ent is released and u n der formal Change Control Changes are ...

Страница 215: ...m 8 7 2 4 Removal Procedure 1 Remove all side plastics 2 Remove the transformer assembly 3 Disconnect the J4 TRX and disconnect the transformer grounding to the chassis 4 Disconnect two power out cables from power entry module 5 Remove power entry module Figure 8 54 Power Entry Module State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Proces...

Страница 216: ...e limits Equipment passes all required tests and is ready for use 4 4 1 Basic Controls 4 4 2 B Mode Checks 4 4 3 M Mode Checks 4 4 4 Measurement Check 4 4 10 S W Config Checks Section 4 5 Peripheral Checks 4 7 1 Probe Connector Check Section 7 6 Service Diagnostics 10 6 5 Chassis Leakage Current Remove these screws State RELEASE Docu m ent is released and u n der formal Change Control Changes are ...

Страница 217: ...Block This page was intentionally left blank State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 217 of 252 ...

Страница 218: ...ent part available from the manufacturer lead time involved Int Internal I O Input Output PWA Printed Wire Assembly Recv Receive XFRMR Transformer Table 9 1 Contents in Chapter 9 S No Description Page Number 1 Overview 9 1 2 List of Abbreviations 9 1 3 Operator Console Assy 9 2 4 Logiq Uno Console FRU List 9 1 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ...

Страница 219: ...on 9 3Operator Console Assy Figure 9 1 Operator Console Assembly State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 219 of 252 ...

Страница 220: ...1 5271538 LCD Monitor Asm for Logiq A3 1 5168531 Keyboard Assy Uno Console 1 5266269 TGC PWA Asm for Logiq A3 1 5181790 Alpha numeric keyboard for Logiq Uno with cables 1 5262338 Optical Trackball Asm 1 5270046 Logiq A3 Software Pen Drive FRU 1 5269718 Rear cover Asm with Labels 1 5262796 Encoder set for Logiq A3 KBD 1 5265162 RH side cover asm with retainable fastener 1 5267220 LH side cover asm ...

Страница 221: ...for Logiq A3 1 5262507 Fastener set for Logiq A3 1 5192656 CA9 Transformer to Front panel and Power supply cable assembly for LOGIQ UNO 1 5192651 CA4 USB Cable Assembly For LOGIQ UNO 1 5192650 CA3 Keyboard Interface Cable For LOGIQ UNO 1 5192657 CA10_Front_Panel_Assembly_Complete_Uno_Console_100 110V 1 5263937 Keyboard knob set Logiq A3 1 2294641 E8C Probe 1 2323337 3S Probe 1 5123455 4C Probe 1 5...

Страница 222: ...65880 POWER CABLE US LOGIQ 3 1 2365881 POWER CABLE EUROPE LOGIQ 3 1 2365882 POWER CABLE INDIA LOGIQ 3 1 5248395 POWER CABLE CHINA LOGIQ 3 1 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 222 of 252 ...

Страница 223: ...ion 9 3 Operator Console Assy State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 223 of 252 ...

Страница 224: ...ble 10 1 Contents in Chapter 10 S No Description Page Number 1 Overview 10 1 2 Why do Maintenance 10 2 3 Periodic Maintenance Schedule 10 2 4 Tools Required 10 4 5 System Maintenance 10 7 6 Electrical Safety Tests 10 12 7 When There s Too Much Leakage Current 10 24 8 PM Inspection Certificate 10 24 CAUTION Practice good ESD prevention Wear an anti static strap when handling electronic parts and ev...

Страница 225: ...rance program Please contact us for coverage information and or price for service Section 10 3Periodic Maintenance Schedule 10 3 1 How often should care maintenance tasks be performed The Care Maintenance Task Schedule provided on page 10 3 specifies how often your LOGIQ A3 should be serviced and outlines items requiring special attention NOTE It is the customer s responsibility to ensure the LOGI...

Страница 226: ... Unit Check Daily Console Leakage Current Checks also after corrective maintenance Peripheral Leakage Current Checks also after corrective maintenance Surface Probe Leakage Current Checks also after corrective maintenance Endocavity Probe Leakage Current Checks Twice Annually Surgical Probe Leakage Current Checks As Prescribed in probe manual Measurement Accuracy Checks also after corrective maint...

Страница 227: ... 9 9487 Utility Knife 9 41581 Screwdriver Blade 3 16 in x 4 in 9 45341 Pliers Vice Grip 10 inch 9 39451 20 Steel Tape locking Spring load 9 3001 Xacto Pen Knife 9 GH807 Ratchet Offset Slotted 9 HT62002 Solder Aid Fork and Hook 68 412 Ratchet Offset Phillips 9 4099 Mirror Round Telescoping 9 GH130 Tapered Reamer 9 GH3001 Steel Rule Decimal 6 inch 9 41584 Screwdriver slotted 1 4 in X 6 in 9 GH300ME ...

Страница 228: ... Pin 3 32 inch 9 44262 Extension 10 inch for 1 2 in drive 2273405 9 42884 Punch Pin 5 32 inch 9 4258 3 8 inch to 1 2 inch Adapter 9 42886 Punch Pin 1 4 inch 9 34374 3 8 inch Metric Socket Set 12 PT 9 42973 Cold Chisel 1 2 inch 9 44311 16mm Socket 12 pt 9 GH77 Center Punch Automatic 9 33485 Metal Socket Tray 9 GH890 File Handle Adj 9 33484 Metal Socket Tray 9 31276 File Round Bastard 8 inch 9 33484...

Страница 229: ...200 to 240 V system 3M 2204 Large adjustable wrist strap 3M 2214 Small adjustable wrist strap 3M 3051 conductive ground cord Anti Static Vacuum Cleaner 46 194427P278 46 194427P279 120V 230V Air Filter See Chapter 9 air intake Safety Analyzer 46 285652G1 DALE 600 KIT or equivalent for electrical tests QIQ Phantom E8370RB RMI Grayscale Target Model 403GS CD RW Media For LOGIQ A3 B W Printer Cleaning...

Страница 230: ...he Ultrasound Inspection Certificate see page 10 29 Note all probes and system options 3 Power up Turn the system power on and verify that all fans and peripherals turn on Watch the displays during power up to verify that no warning or error messages are displayed 4 Probes Verify that the system properly recognizes all probes 5 Displays Verify proper display on the monitor State RELEASE Docu m ent...

Страница 231: ...system channels are functional Control Panel Test Perform the Control Panel Test Procedure to verify that all keyboard controls are OK This is performed by the internal PC backend processor which does a normal keyboard run through Monitor Verify basic Monitor display functions Table 10 8 GE Approved Peripheral Hardware Option Functional Checks Step Item Description 2 B W Printer Verify hardcopy ou...

Страница 232: ... Screen Clean etc because these contain ammonia which will remove the anti glare coating on the monitor 4 Keyboard Rubber Keypad Use a fluid detergent in warm water on a soft damp cloth to carefully wipe the entire system Be careful not to get the cloth too wet so that moisture does not enter the console Table 10 11 Air Filter Cleaning frequency varies with your environment Step Item Description 1...

Страница 233: ...peration of foot brake to stop the unit from moving and release mechanism Check all wheel locks and wheel swivel locks for proper operation 6 Cables Connectors Check all internal cable harnesses and connectors for wear and secure connector seating Pay special attention to footswitch assembly and probe strain or bend reliefs 7 Shielding Covers Check to ensure that all EMI shielding internal covers ...

Страница 234: ...ockets before plugging in a probe TEE and Interoperative probes often have special considerations and individual probe user manuals For TEE and Interoperative probes also refer to their separate user manuals 10 5 6 3 Basic Probe Cleaning Refer to the User s Manual for details on probe cleaning NOTE To help protect yourself from blood borne diseases wear approved disposable gloves These are made of...

Страница 235: ...acked or damaged in any way Check probe leakage current once a year on surface probes twice a year on endocavitary probes whenever probe damage is suspected WARNING WARNINGTHE USER MUST ENSURE THAT THE SAFETY INSPECTIONS ARE PERFORMED AT LEAST EVERY 12 MONTHS ACCORDING TO THE REQUIREMENTS OF THE PATIENT SAFETY STANDARD IEC EN 60601 1 ONLY TRAINED PERSONS ARE ALLOWED TO PERFORM THE SAFETY INSPECTIO...

Страница 236: ...nology Corporation or equivalent device Table 10 14 Chassis Leakage Current Limits Accessible Metal Surfaces Country Normal Condition Open Ground Reverse Polarity Open Neutral USA N A 0 3 mA 0 3 mA N A Other 0 1 mA 0 5 mA 0 5 mA 0 5 mA Table 10 15 Type BF Applied Part Leakage Current Limits Non Conductive Floating Surface and Cavity Probes Country Normal Condition Open Ground Reverse Polarity Open...

Страница 237: ...o be tested comparing the lamp status NOTE No outlet tester can detect the condition where the Neutral grounded supply conductor and the Grounding protective earth conductor are reversed If later tests indicate high leakage currents this should be suspected as a possible cause and the outlet wiring should be visually inspected Figure 10 1 Typical Alternate Outlet Tester Figure 10 2 Dale 600 Outlet...

Страница 238: ...Plug the black chassis cable into the meter s CHASSIS connector and attach the black chassis cable clamp to an exposed metal part of the LOGIQ A3 unit 4 Set the meter s FUNCTION switch to the RESISTANCE position 5 Set the meter s POLARITY switch to the OFF center position 6 Measure and record the ground wire resistance CAUTION Electric Shock Hazard The patient must not be contacted to the equipmen...

Страница 239: ...er to the Dale 600 Instruction Manual for meter self tests and operation Record measured resistance of the grounding continuity The ground wire resistance should be less than 0 2 Use any safety analyzer Figure 10 4 Dale 600 Ground Continuity Test Chassis Cable Clamp Normal Reverse Polarity Neutral Open Closed Functions Selector Outlet Test Lamps State RELEASE Docu m ent is released and u n der for...

Страница 240: ...similar test instrument its power plug may be inserted into the wall outlet and the equipment under test is plugged into the receptacle on the panel of the meter This places the meter in the grounding conductor and the current flowing from the case to ground will be indicated in any of the current ranges The maximum allowable limit for chassis source leakage is shown in Table 10 14 CAUTION Electri...

Страница 241: ...nd attach the black chassis cable clamp to an exposed metal part of the LOGIQ A3 4 Set the tester s FUNCTION switch to CHASSIS position 5 Follow the test conditions described for respective test points shown in Table 10 17 6 Keep a record of the results with other hard copies of PM data kept on site Figure 10 6 Ground and Chassis Leakage Current Test Table 10 17 Chassis Leakage Current Test Condit...

Страница 242: ...itch Tester Neutral or Ground Switch Test 1 Probe Connector Screw Test 2 Metal on Wheel Test 3 Screws on CRT Housing OptionalTest 4 Rear Panel Connectors Optional Test 5 Enter Name of tested peripheral here ON NORM OPEN ON NORM CLOSED ON REV OPEN ON REV CLOSED OFF NORM OPEN OFF NORM CLOSED OFF REV OPEN OFF REV CLOSED State RELEASE Docu m ent is released and u n der formal Change Control Changes ar...

Страница 243: ...ete the current path Saline solution is a mixture of water and salt The salt adds a free ion to the water making it conductive Normal saline solution is 0 9 salt or 1 2 gram salt per 1 liter of water If saline is not available a mixture of 1 quart water with one or more grams of table salt mixed thoroughly will substitute Follow these steps to test each transducer for leakage current 1 Turn the LO...

Страница 244: ... second half 9 Depress the ISO TEST rocker switch and record the highest current reading 10 Follow the test conditions described in Table 10 19 for every transducer 11 Keep a record of the results with other hand copies of PM data Figure 10 8 Transducer Source Leakage Current Test State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process Se...

Страница 245: ...e for test with the connector of the console 6 Add the saline probe and the imaging area of the probe into the saline bath 7 Have unit power ON for the first part turn it OFF for the second half 8 Depress the ISO TEST rocker switch and record the highest current reading 9 Follow the test conditions described in Table 10 19 for every transducer 10 Keep a record of the results with other hand copies...

Страница 246: ...FF before switching them using the POLARITY switch and or the NEUTRAL switch Otherwise the unit may be damaged Table 10 19 Typical Data Sheet For Transducer Source Leakage Current Transducer Tested Unit Power Tester Power Polarity Switch Tester GROUND or NUETRAL Switch Measurement ON NORM OPEN ON NORM CLOSED ON REV OPEN ON REV CLOSED OFF NORM OPEN OFF NORM CLOSED OFF REV OPEN OFF REV CLOSED State ...

Страница 247: ...nt of leakage dependent on its design Small variations in probe leakage currents are normal from probe to probe Other variations will result from differences in line voltage and test lead placement The maximum allowable leakage current for body surface contact probe differs from inter cavity probe Be sure to enter the correct probe type in the appropriate space on the check list If excessive leaka...

Страница 248: ...requency Scan Format Model Number Serial Number Probe 5 Frequency Scan Format Model Number Serial Number Probe 6 Frequency Scan Format Model Number Serial Number Probe 7 Frequency Scan Format Model Number Serial Number Probe 8 Frequency Scan Format Model Number Serial Number Probe 9 Frequency Scan Format Model Number Serial Number Functional Check if applicable OK or N A Physical Inspection and Cl...

Страница 249: ...is Source Leakage Current Probe Chassis Source Leakage Current Wheel Chassis Source Leakage Current CRT Peripheral 1 Leakage Current Peripheral 1Ground Continuity Peripheral 2 Leakage Current Peripheral 2Ground Continuity Peripheral 3 Leakage Current Peripheral 3Ground Continuity PROBES Probe Number from previous page Max Value Allowed Max Value Measured OK Comments Probe 1 Probe 2 Probe 3 Probe 4...

Страница 250: ...ical Safety 7 Minimal Floor Plan Suggestion 8 P Power Off 16 Power On 14 Power up Procedures Voltage Settings 11 Prepearing the Unit for Installation 11 Probe Connector Cleaning 11 Probes Connector Usage Functional Checks 10 Purchaser Responsibilities 6 R Receiving and Unpacking the Equipment 3 Regulatory 1 S Safety Considerations 7 Service Adjustments 1 Shutdown 16 System Maintenance 7 T Time and...

Страница 251: ...MANUAL Index 2 State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 251 of 252 ...

Страница 252: ... 212 28 02 208 Deutschland GmbH Co KG Beethovenstrabe 239 Postfach 11 05 60 D 42655 Solingen Germany State RELEASE Docu m ent is released and u n der formal Change Control Changes are su b ject to the ECR ECO Process See the GEHC My w o rkshop Sy s tem to determine the statu s of this docu m ent Approved Document 5213326 100TPH_r3 pdf Page 252 of 252 ...

Отзывы: