Length of refrig
eration pipe
7 m
10 m
15 m
20 m
30 m
Yg/m
(1) The outdoor module is pre-charged with 1,300 kg of refrigerant fluid.
(2) Calculation: Xg = Yg/m x (pipe length (m) – 7)
Tab.19
Length of refrigeration pipe
AWHP 6 MR-3
AWHP 8 MR-2
AWHP 11 MR-2
AWHP 16 MR-2
AWHP 11 TR-2
AWHP 16 TR-2
11 to 20 m
+ 0.2 kg
+ 0.15 kg
+ 0.2 kg
21 to 30 m
+ 0.4 kg
+ 0.3 kg
+ 0.4 kg
31 to 40 m
+ 0.6 kg
+ 0.9 kg
+ 1 kg
41 to 50 m
not permitted
not permitted
+ 1.6 kg
51 to 60 m
not permitted
not permitted
+ 2.2 kg
61 to 75 m
not permitted
not permitted
+ 2.8 kg
7.4.2
Connecting the refrigeration link
Important
Use a flat spanner to hold the hoses during the various opera
tions.
1. Partially unscrew the 5/8" nut.
Fig.40
Holding with a flat spanner
MW-3000541-01
Fig.41
Partial loosening of the 5/8" nut
MW-3000542-01
1
7 Installation
7685645 - v04 - 07032018
AWHP-2 iMPI
47