A5-2
IM 34M06C11-01E
A5.2
Routine Inspection
Routine inspection comprises the minimum level of checks used to determine whether
any fault might occur in the day’s operation. Observing these procedures properly will
enable you to maintain stable FA-M3 operation.
Category
Check item
Criterion
Power supply
Are the voltage fluctuations within
the specified limits when measured
at the power supply terminals?
Limits
F3PU10-0N
F3PU10-0S
F3PU20-0N
F3PU20-0S
F3PU30-0N
F3PU30-0S
85 to 264V AC
F3PU16-0N
F3PU16-0S
F3PU26-0N
F3PU26-0S
F3PU36-0N
F3PU36-0S
15.6 to 31.2V DC
Input/output
power supply
Are the voltage fluctuations within
the specified limits when measured
at the I/O terminal block.
As per the specifications for the individual
input/output module.
Environment
Is the ambient temperature (inside
the panel enclosure) normal?
0 to 55°C
Is the ambient humidity (inside the
panel enclosure) normal?
10 to 90% RH (non-condensing)
Is there any accumulation of dust?
Must be free of dust.
Mounting
state
Is each module secured?
Must be secured firmly.
Are all cable connectors fully fitted
and secured in place?
Must be secured firmly.
Are there any loose external cable
screws?
Must be secured firmly.
Are there any cuts or nicks in the
external cables?
Must be free of visible flaws.
Tools Required for Inspection
- Philips and flat-blade screwdrivers
- Multi-meter or digital voltmeter
- Thermometer
- Humidity gauge
A5.
Summary of Contents for FA-M3V e-RT3 Plus
Page 2: ...Blank Page ...
Page 14: ...Blank Page ...
Page 20: ...Blank Page ...
Page 21: ...TOC A 1 IM 34M06C11 01E Hardware Manual Part A Standard Version IM 34M06C11 01E 40th Edition ...
Page 22: ...Blank Page ...
Page 34: ...Blank Page ...
Page 160: ...Blank Page ...
Page 201: ...A3 41 IM 34M06C11 01E Figure A3 37 Example of Installation Measures ...
Page 220: ...Blank Page ...
Page 232: ...Blank Page ...
Page 242: ...Blank Page ...
Page 252: ...Blank Page ...
Page 254: ...Blank Page ...
Page 268: ...Blank Page ...
Page 274: ...Blank Page ...