12-19
IM AQ1300-01EN
E-OAM T
est
3
2
1
4
5
6
7
8
9
10
11
12
13
14
15
16
App
Index
12.9 Starting and Stopping a CC Test
Procedure
After entering the settings described in sections 12.1 to 12.4, 12.6, and 12.7, you can execute an
E-OAM CC test.
Starting a CC Test
1.
Press
START
. The following screen appears, and a CC test starts.
Network status ►section 2.1
Title bar ►section 2.1
Measurement status ►section 2.1
Test information
Test results
Statistics counter and error
detection history
►
section 2.1
Execute an LT and Multicast LB or
transmit RDI frames
►
section 12.10 (LT, multicast LB)
File
Save the measured results of CC tests.
►section 13.2
Displays detailed statistics
Tx and Rx CCM
frame information
Stopping a CC Test
Press
STOP
to display the following screen and stop measurement.
Indication that measurement has finished
Remaining Tx time