YH4
GRAND
VITARA
1. Packing
2. Planetary gear
3. Bolt hole
4. Seal rubber
1. Ball
1. Bolts
2. Reduction gear assembly
1. Magnetic switch
2. Protector
CRANKING SYSTEM
6G-11
11) Install packing so that cuts in packing align with holes for
through bolts in front housing.
12) Install plate and seal rubber to front housing.
13) Apply grease to ball and install ball into shaft hole.
14) Install yoke, armature, brush holder and rear bracket to front
housing by aligning match marks provided before removal.
15) Tighten through bolts.
16) Install magnetic switch assembly and protector (if equipped).
Connect wire (switch to motor) to switch terminal.
17) Upon completion of assembly, carry out PERFORMANCE
TEST. (Refer to page 6G-16.)
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...