YH4
GRAND
VITARA
1. Stator
2. Brush
3. Brush holder
4. Solder
5. Brush spring
1. Pulley nut
2. Rotor
3. Cloth
4. Vise
1. Rear housing
2. Wire
CHARGING SYSTEM
6H-27
REASSEMBLY [60 A type]
Assemble in reverse order of DISASSEMBLY, noting the following.
1) Be sure to install brushes in the proper direction and solder
brush wires and stator leads.
2) Tighten generator pulley nut to specified torque.
Tightening Torque
(a): 118 N
.
m (11.8 kg-m, 85.5 lb-ft)
NOTE:
When using vise, put clean cloth between rotor and vise
so as not to cause damage to rotor.
Be sure to hold the location A. Do not hold the location B
as it does not have enough structural strength.
3) Push brushes into brush holder, then support brushes by insert-
ing appropriate wire from hole of rear housing.
NOTE:
After installing rotor, remove wire.
Check to make sure that match marks on front and rear
housing are aligned.
Do not apply grease to rear (rotor) bearing. Remove oil
completely if found in bearing box of rear housing.
4) After assembling generator, make sure that rotor turns smoothly.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...