YH4
GRAND
VITARA
6A2-26
ENGINE MECHANICAL (H25 ENGINE)
(e)
1
(a)
(d): Long size
1. Oil pump chain guide
3) Assemble oil pump. After assembling oil pump check to be sure
that rotor turns smoothly by hand.
Tightening Torque
(a): 12.0 N
.
m (1.2 kg-m, 8.5 lb-ft)
INSTALLATION
1) Install oil pump to crankcase.
Tightening Torque
(c), (d): 27.0 N
.
m (2.7 kg-m, 19.5 lb-ft)
2) Hand-tighten oil pump chain guide bolts.
3) To take up slack of oil pump chain, push center of oil pump chain
guide with a force of 0.5 to 0.6 N (50 – 60 g, 0.11 – 0.13 lb) then
tighten oil pump chain guide bolts to specified torque.
Tightening Torque
(e): 11 N
.
m (1.1 kg-m, 7.5 lb-ft)
4) Install timing chain cover, oil pump strainer and oil pan.
Refer to item “TIMING CHAIN COVER” in this section.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...