YH4
GRAND
VITARA
ENGINE COOLING
6B-17
1. Cooling fan /
clutch nut
1. Radiator
2. Inlet hose (Outlet from oil cooler)
3. Outlet hose (Inlet to oil cooler)
INSTALLATION
Install removed parts in reverse order of removal procedure.
After installation, adjust belt tension for specification and tighten
each bolt and nut securely.
Tightening Torque
Cooling fan / dutch nut (G16 engine) (a):
11 N
.
m (1.1 kg-m, 8.0 lb-ft)
Cooling fan / dutch nut (H25 and J20 engines) (a):
25 N
.
m (2.5 kg-m, 18.0 lb-ft)
Refill cooling system with proper coolant referring to “COOLANT”
and steps 8) to 10) of “COOLING SYSTEM FLUSH AND REFILL”
in this section.
After installation, check each joint for leakage.
RADIATOR
REMOVAL
1) Disconnect negative (–) cable at battery.
2) Drain cooling system by loosening drain plug (1) of radiator.
3) When servicing A / T vehicle, place oil pan under radiator (1) and
disconnect A / T fluid hoses (2), (3) from radiator.
4) Loosen cooling fan / clutch nuts (1).
5) Disconnect radiator inlet hose from radiator.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...