YH4
GRAND
VITARA
6A2-30
ENGINE MECHANICAL (H25 ENGINE)
2, (a)
1. Crank timing pulley key
2. Oil jet
1. Idler sprocket No.2
2.
mark
3. Crankshaft
1. Timing chain guide No.4
2. Bolts
1. Knock pin of LH bank intake camshaft
2. Knock pin of LH bank exhaust camshaft
3. Match mark of intake side
4. Match mark of exhaust side
1. Yellow plate
2. Match mark of LH bank 2nd timing chain
INSTALLATION
1) Check timing mark on crankshaft as shown in figure.
2) Check timing mark on idler sprocket No.2 as shown in figure.
3) Install timing chain guide No.4.
Tightening Torque
(a): 11 N
.
m (1.1 kg-m, 7.5 lb-ft)
4) Check that knock-pins of intake and exhaust camshafts are
aligned with match marks on cylinder head as shown in figure.
5) Install by aligning match marks on yellow plate of LH bank 2nd
timing chain and idler sprocket No.2.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...