YH4
GRAND
VITARA
ENGINE MECHANICAL (H25 ENGINE)
6A2-75
1. Gaging plastic
2. Scale
Finished
crank pin dia.
=
Measured big end bore
dia. (including under-
size bearing)
0.054 mm
(0.0021 in.)
–
5) Remove cap and using a scale on gaging plastic envelope,
measure gaging plastic width at the widest point (clearance).
If clearance exceeds its limit, use a new standard size bearing
and remeasure clearance.
Item
Standard
Limit
Bearing
clearance
0.045 – 0.063 mm
(0.0018 – 0.0025 in.)
0.08 mm
(0.0031 in.)
6) If clearance can not be brought to within its limit even by using
a new standard size bearing, regrind crank pin to undersize as
follows.
a) Install 0.25 mm undersize bearing to connecting rod big
end.
b) Measure bore diameter of connecting rod big end.
c) Regrind crank pin to following finished diameter:
d) Confirm that bearing clearance is within above standard
value.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...