YH4
GRAND
VITARA
6A2-36
ENGINE MECHANICAL (H25 ENGINE)
1. Bush
1. Latch
2. Tooth surface
1. Crank timing pulley key
1. Crankshaft
2. Crankshaft timing sprocket
3. Lower crankcase
2. Oil jet
Idler sprocket No.2
Check teeth of sprocket for wear or damage.
1st timing chain
Check timing chain for wear or damage.
Timing chain tensioner adjuster No.1
Check that latch and tooth surface are free from damage and latch
functions properly.
INSTALLATION
1) Check timing mark on crankshaft as shown in figure.
2) Install 1st timing chain crankshaft sprocket as shown in figure.
Confirm that tooth for CKP sensor are free from metal particles
and damage.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...