YH4
GRAND
VITARA
1. Magnetic switch
2. Commutator end
cover
3. Yoke
4. Drive housing
1. Magnetic switch
1
4
3
2
A
B
1
CRANKING SYSTEM
6G1-7
DISASSEMBLY
NOTE:
Before disassembling starting motor, be sure to put match
marks at two locations (A and B) as shown in the left figure
so that any possible mistakes can be avoided.
Do not clamp yoke in a vise or strike it with a hammer during
disassembling and reassembling.
1) Remove nut securing the end of field coil lead to terminal on the
head of magnetic switch.
2) Take off magnetic switch from starting motor body by removing
2 mounting screws.
NOTE:
Don’t disassemble this switch. If defective, replace as a
complete assembly.
3) Loosen 2 bolts and 2 screws to remove commutator end cover.
4) Separate drive housing and armature from yoke.
5) Draw brushes out of holder.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...