YH4
GRAND
VITARA
6A2-42
ENGINE MECHANICAL (H25 ENGINE)
1. Shoe
2) Remove LH bank 2nd timing chain.
Refer to item “LH (NO.1) BANK 2ND TIMING CHAIN AND
CHAIN TENSIONER” in this section for removal.
3) Remove 1st timing chain.
Refer to item “1ST TIMING CHAIN AND CHAIN TENSIONER”
in this section for removal.
4) Remove timing chain guide No.3.
5) Loosen camshaft housing bolts in such order as indicated in fig-
ure and remove them.
6) Remove camshaft housings.
7) Remove RH bank intake camshaft, RH bank exhaust camshaft,
and RH bank 2nd timing chain as a set.
8) Remove timing chain tensioner adjuster No.2.
INSPECTION
Timing chain guide No.3
Check shoe for wear or damage.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...