YH4
GRAND
VITARA
6A2-40
ENGINE MECHANICAL (H25 ENGINE)
18) Install LH bank 2nd timing chain.
Refer to item “LH (NO.1) BANK 2ND TIMING CHAIN AND
TENSIONER” in this section for installation.
19) Install timing chain cover.
Refer to item “TIMING CHAIN COVER” in this section for instal-
lation.
20) Install oil pan, front differential housing, P / S system, cooling
system, intake manifold with throttle body and other parts.
21) Refill cooling system with coolant, front differential with gear oil,
P / S system with specified fluid and engine with engine oil.
22) Check wheel alignment referring to Section 3.
23) Verify that there is no fuel leakage, water leakage and oil leak-
age at each connection.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...