YH4
GRAND
VITARA
1. Lug
2. Hole
1. Tensioner bolt
2. Tensioner
1. “V” mark
2. Timing mark
by “E”
3. Tensioner plate
1. Arrow mark
2. Punch mark
6A1-20
ENGINE MECHANICAL (G16 ENGINE)
Inspect tensioner for smooth rotation.
INSTALLATION
1) Install tensioner plate to tensioner.
Insert lug of tensioner plate into hole in tensioner.
2) Install tensioner and tensioner plate:
Do not tighten tensioner bolt with wrench yet. Hand tighten only
at this time.
Check to ensure that plate movement in arrow direction as
shown in figure causes tensioner to move in the same direction.
If no associated movement between plate and tensioner occurs,
remove tensioner and plate again and reinsert plate lug into ten-
sioner hole.
3) Check that timing mark on camshaft timing belt pulley is aligned
with “V” mark on cylinder head cover. If not, align two marks by
turning camshaft but be careful not to turn it more than its allow-
able turning range which is described on page 6A1-19.
4) Check that punch mark on crankshaft timing belt pulley is
aligned with arrow mark on oil pump case. If not, align two marks
by turning crankshaft but be careful not to turn it more than its
allowable turning range which is described on page 6A1-19.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...