YH4
GRAND
VITARA
6A1-80
ENGINE MECHANICAL (G16 ENGINE)
8) Install pistons and connecting rods as previously outlined.
9) Install oil pump strainer and oil pan as previously outlined.
10) Install cylinder head assembly to cylinder block as previously
outlined.
11) Install camshaft, crankshaft timing belt pulley, timing belt,
crankshaft pulley, water pump pulley, etc., as previously out-
lined.
12) Install clutch to flywheel (for M / T vehicle). For clutch installa-
tion, refer to “CLUTCH” section.
13) Install engine mountings brackets.
Tightening Torque
(a): 50 N
.
m (5.0 kg-m, 36.5 lb-ft)
(b): 85 N
.
m (8.5 kg-m, 61.5 lb-ft)
14) Install engine assembly to vehicle as previously outlined.
Summary of Contents for 2000 Grand Vitara SQ416
Page 75: ...ENGINE DIAGNOSIS G16 J20 ENGINES 6 71 Fig 1 for Step 3...
Page 179: ...6 1 68 ENGINE H25 ENGINE a Fig for STEP 2 3 a HO2S heater relay...
Page 190: ...ENGINE H25 ENGINE 6 1 79 a Fig for STEP 2 3 a HO2S heater relay...
Page 541: ...6E1 4 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES G16 ENGINE...
Page 542: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 5...
Page 543: ...6E1 6 ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES J20 ENGINE...
Page 544: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 7...
Page 552: ...ENGINE AND EMISSION CONTROL SYSTEM G16 J20 ENGINES 6E1 15...
Page 592: ...6E2 4 ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE...
Page 593: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 5...
Page 597: ...ENGINE AND EMISSION CONTROL SYSTEM H25 ENGINE 6E2 9...
Page 723: ...6H 30 CHARGING SYSTEM 17 Make sure that rotor turns smoothly...