Operating
7.9 Pump control
HydroRanger 200 HMI
Operating Instructions, 06/2018, A5E36281317-AC
117
7.9
Pump control
7.9.1
Setting a pump down group
Example: sewage wet well
Set a group of three pumps to pump down a wet well
①
Inflow
③
Empty (2.2.4.) (Page 170)
②
Span (2.2.2) (Page 169)
④
Outflow
Set the common parameters
Prerequisite: Substitute the details of your application in place of the sample values
provided. If you are bench testing the unit, set your test values to be the same as the sample
values.
Parameter
Index
1
Value/Mode
Description
(Page 163)
Global
*Level (Page 163) Operation = *Level (Page 163)
(Page 165)
Global
Liquid
Material = *Liquid
(Page 174)
Global
Medium
Maximum Process Speed = *Medium
(1.0 m/min) (Page 174)
(Page 164)
Global
XPS-10
Transducer = XPS-10 (single-point
preset)
Units (2.1.1) (Page 162) Global
Meters
Units = Meters
(Page 170)
Global
1.8
Empty = 1.8 m
Span (2.2.2.) (Page 169) Global
1.4
Span = 1.4 m
1
Example assumes a single measurement unit. If your device has dual-point software
installed, then some parameters are indexed by two level points.
Summary of Contents for HydroRanger 200 HMI
Page 2: ......
Page 24: ...Safety notes HydroRanger 200 HMI 22 Operating Instructions 06 2018 A5E36281317 AC ...
Page 354: ...Updating software HydroRanger 200 HMI 352 Operating Instructions 06 2018 A5E36281317 AC ...
Page 362: ......
Page 403: ......