Rostock MAX v2 Assembly Guide
Install two of the idler bearing assemblies on the two screws you just inserted and add the tower
support plate on top. Add two #6-32 flat washers and two #6-32 Nylon lock nuts and tighten them
finger tight. The looseness will help install it in the bottom plate and assist in fitting the top plate.
Repeat this process for the other two assemblies.
Checkpoint Video #2:
59
Fig. 4-39: Idler bearings installed.
Fig. 4-40: Tower support installed.
Fig. 4-41: X and Y axis motors.
Summary of Contents for Rostock MAX v2
Page 25: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 1 25 ...
Page 26: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 2 Melamine Parts Sheet 3 26 ...
Page 27: ...Rostock MAX v2 Assembly Guide Melamine Parts Sheet 4 27 ...
Page 171: ...Rostock MAX v2 Assembly Guide 171 Fig 14 8 Spool holder support installed ...