![background image](http://html1.mh-extra.com/html/rainbow/turbo-carnival-clubhouse/turbo-carnival-clubhouse_assembly-instructions-manual_3449621079.webp)
1228
1229
1229
1231
0081
H194
3/4"
15 13/16"
45°
1228
1229
1231
1229
1231
0081
36"
CUT OFF AND
DISCARD THIS END
ROUTER AND STAIN
CUT END
3158
Continued on next page:
1. Position Roof Boards
(1234)
on Roof Supports
(3156) (3157)
(as shown). Center Roof Boards
(1234)
on Roof Supports
(3156) (3157).
Starting at the top, attach Roof Boards using #8
Hardware
(H152)
.
*NOTE: The Roof Boards (1234) should be positioned so there is no gap at the peak
(as shown in Inset A) and the outside edge should be flush with Peak Facia (0080)
(as shown).
2. Prior to attaching Roof Runners
(3158)
, one Roof Runner will have to be cut down to
36" long
(as
shown below). Router and stain cut end of Roof Runner after cutting.
3. After attaching the first 5-6 Roof Boards
(1234)
(on each roof side), center and attach Roof
Runners
(3158)
to Roof Boards
(1234)
using #8 Hardware
(H152).
*NOTE: To ensure screws in bottom Roof Boards hit the Roof Runners, position Roof
Runners 1 3/8" down from top Roof Boards.
*NOTE: Cut down Roof Runner (3158) will be used on lower level, middle Roof (as shown).
3. Finish attaching the rest of Roof Boards
(1234)
to Roof Supports
(3156) (3157)
using #8 Hardware
(H152)
and to Roof Runners
(3158)
using #8 Hardware
(H152)
.
*NOTE: A Qty. of (13) Roof Boards (1234) will be used on the lower level, middle Roof.
4. On a flat surface position Fan Horizontal
(1231)
, Fan Vertical
(1228)
, and Fan Center
(0081)
, using
measurements shown below, and attach using #8 Hardware
(H194)
.
5. Position Fan Rays
(1229)
(as shown below) and attach to Fan Center
(0081)
using #8
Hardware
(H194)
. Repeat #'s 4 & 5 for other three Fans.
6. Position assembled Fans against Roof Supports
(3156) (3157)
and pushed up tight to roofs, and
attach to Roof Supports
(3156) (3157)
using #8 Hardware
(H152)
(as shown in Inset B).
FAN ASSEMBLY
78
Step 35
Wood Roof
Installation