![background image](http://html1.mh-extra.com/html/rainbow/turbo-carnival-clubhouse/turbo-carnival-clubhouse_assembly-instructions-manual_3449621060.webp)
A
2 13/16"
2 3/16"
2 13/16"
2 3/16"
IF INSTALLING MONKEY BAR, RAMP, BUBBLE
WINDOW, TIC TAC TOE OR FIRE POLE DO NOT
INSTALL THESE RAIL UPRIGHTS IN THIS STEP
4050
3137
4051
3137
H155
H155
H155
H155
6131
3143
3139
6132
3135
3135
4051
3139
3143
6134
3138
3138
6174
6173
*NOTE: If installing the Cabin package on Upper Level, do not install Rail Uprights (3137)
(3138) on Upper Level at this time.
*NOTE: When evenly spacing Rail Uprights (3137) across Top Joist w/ Swing Holes (6131) and
4 Hole Facia (4050), spacing between Rail Uprights will be approximately 2 13/16".
When evenly spacing Rail Uprights across 6 Hole Facias (4051) and Accessory Arm
(6134), spacing between Rail Uprights will be approximately 2 3/16".
1. Evenly space Rail Uprights
(3137)
across Corner Facias
(3139)
, 2 Hole Facias
(3143)
, 4 Hole Facia
(4050)
, 6 Hole Facias
(4051)
, Top Joist
(6131)
and Accessory Arm
(6134)
. Attach Rail Uprights using
#8 Hardware
(H155).
*NOTE: If installing Monkey Bar, Ramp, Bubble Window, Tic Tac Toe, Fire Pole, Ramp or
Coil Climber options, Rail Uprights (3137) will be installed in a later Step.
2. Position Rail Uprights with Handle Holes
(3138)
against Top Joist
(6132)
and Corner Facias
(3135)
,
flush with ends of Corner Facias
(3135)
, and attach using #8 Hardware
(H155)
.
3. Center and attach a Rail Upright
(3137)
in between each Rail Upright w/Handle Holes
(3138)
and
Corner Uprights
(6173) (6174)
using #8 Hardware
(H155)
.
59
Step 18
Rail Upright
Installation