Continued on next page:
*NOTE: Processes will be the same for both the 2 Position (7856) and 3 Position (7857) Dual
Attach Swing Beams.
*NOTE: Position sets so that Top Joists measure 98 5/8" apart for the 3 Position Swing Beam,
and 66 5/8" apart for the 2 Position Swing Beam.
1. Attach Swing Hangers
(N26)
to Swing Beam
(7856) (7857)
using 3/8" Hardware
(H3) (H11) (H24)
(H28) (H135)
and 3/8" Bolt Cups
(N29)
.
2. Center Plaque
(N83)
on Swing Beam
(7856) (7857)
and attach using #10 Hardware
(H157)
.
*NOTE: If attaching two Clubhouses together, the Riser Block (7855) will not have to be
installed. Skip to #4 and install Swing Beam Plates (N10) using the same processes.
3. On Clubhouse side, position Riser Block
(7855)
on top of Top Joist
(6131)
, centering middle hole in
Riser Block over the middle hole in Top Joist. Position Swing Beam Plate
(N10)
on top of Riser
Block
(7855)
, centering middle hole in Swing Beam Plate with the center hole of the Riser Block.
Attach Riser Block
(7855)
and Swing Beam Plate
(N10)
to Top Joist
(6131)
through the outer two
holes in the Swing Beam Plate and Riser Block using 3/8" Hardware
(H121)
and 3/8" Bolt Cups
(N29)
(as shown in Inset A).
4. On the Castle side, position Swing Beam Plate
(N10)
on top of Top Joist
(6117)
, centering middle hole
in Swing Beam Plate with the middle hole in the Top Joist. Attach Swing Beam Plate
(N10)
, through
through the two outer holes in the Swing Beam Plate, to the Top Joist using 3/8" Hardware
(H116)
and 3/8" Bolt Cups
(N29)
(as shown in Inset B).
*NOTE: If installing Dual Attach Swing Beam (7856) (7857) between a Clubhouse and a Castle,
the hole closest to the end of the Swing Beam will have to be drilled out using a 9/16"
drill bit, only on the Clubhouse side.
5. Lift up the Swing Beam
(7856) (7857)
on top of both Swing Beam Plates
(N10)
, lining up the holes in
ends of Swing Beam with the middle holes in Swing Beam Plates
(N10)
.
*NOTE: If attaching two Clubhouses together, skip to #7 and install Swing Beam (7856) (7857)
using the same processes.
6. On Clubhouse side, attach Swing Beam
(7856) (7857)
through Riser Block
(7855)
, Top Joist
(6131)
and Swing Beam Plate
(N10)
using 1/2" Hardware
(H4) (H12) (H18) (H29) (H225)
and 3/8" Hardware
(H3) (H11) (H17) (H28) (H56)
(as shown in Inset A).
7. On Castle side, attach Swing Beam
(7856) (7857)
through Top Joist
(6117)
and Swing Beam Plate
(N10)
using 1/2" Hardware
(H4)
and 3/8" Hardware
(H3) (H11) (H17) (H28) (H56) (H60)
(as shown
in Inset B).
121
Step 73
Dual Attach Swing Beam
Installation