1. Setup
ABL90 FLEX reference manual
1-38
Step Action
1.
Highlight the desired user activity on the User activities screen
and press Edit.
2.
Press the Keyboard button to edit the text. Confirm the text with
Enter.
Change, if desired, the interval or next date (confirm the date with
Enter).
3.
Press Back to return to the User activities screen and edit other
user activities in the same manner.
Step Action
1.
On the User activities screen, highlight the action to be deleted
and press Delete.
2.
Press Continue to delete the activity or press Cancel to return to
the User activities screen.
Editing a user
activity
Deleting a user
activity
Summary of Contents for FLEX ABL90
Page 1: ...ABL90 FLEX reference manual ...
Page 2: ......
Page 3: ...ABL90 FLEX reference manual ...
Page 4: ......
Page 124: ...3 Wet section ABL90 FLEX reference manual 3 10 ...
Page 125: ...4 Electronics General information 4 2 Electronic boards and components 4 3 ...
Page 216: ...7 Performance characteristics ABL90 FLEX reference manual 7 30 ...
Page 263: ...9 Solutions General information 9 2 Solutions 9 3 Certificate of traceability 9 5 ...
Page 267: ...ABL90 FLEX reference manual 9 Solutions 9 5 Certificate of traceability ...
Page 268: ...9 Solutions ABL90 FLEX reference manual 9 6 ...
Page 269: ...10 1 10 Messages List of analyzer messages 10 2 ...
Page 310: ...10 Troubleshooting updated for software version 2 3 ABL90 FLEX reference manual 10 42 ...
Page 326: ...Appendix Quality control ABL90 FLEX reference manual I 16 ...
Page 327: ...II Appendix Traceability to the primary standards at Radiometer ...
Page 334: ...Appendix Traceability to the primary standards at Radiometer ABL90 FLEX reference manual II 8 ...