Remove the PCI Mezzanine
■
CPU modules
■
Flash modules and Flash module cable
■
ESM riser and ESM
■
Battery
It is not necessary to remove the PCI mezzanine for other components. However, when you
remove the PCI mezzanine, you make additional working space available.
■
“Remove the PCI Mezzanine” on page 102
■
“Install the PCI Mezzanine” on page 104
Related Information
■
“Replacing PCIe2 Cards” on page 112
Remove the PCI Mezzanine
Note -
PCIe2 cards installed in slots 4 and 5, as well as the installed SAS controller HBA, can
remain in place when removing the PCI Mezzanine.
1.
Prepare the server for service.
See
“Preparing the Server for Component Replacement” on page 75
.
2.
Disconnect all I/O cables from the rear of the PCI mezzanine.
These cables should have been removed prior to removing the server from the rack. These
cables include the external SAS cable, alarm cable, and any I/O cables connected to installed
PCIe cards.
3.
Disconnect the following PCI mezzanine cables:
■
LED board cable
■
Fan tray 1 power cable
■
Power cable from PDB
■
Internal SAS HBA cable
■
Fan tray 2 power cable
102
Sun Netra X4270 Server • September 2015
Summary of Contents for Sun Netra X4270
Page 1: ...Sun Netra X4270 Server Service Manual Part No E23171 03 September 2015 ...
Page 2: ......
Page 10: ...10 Sun Netra X4270 Server September 2015 ...
Page 12: ...12 Sun Netra X4270 Server September 2015 ...
Page 36: ...36 Sun Netra X4270 Server September 2015 ...
Page 72: ...72 Sun Netra X4270 Server September 2015 ...
Page 100: ...100 Sun Netra X4270 Server September 2015 ...
Page 224: ...224 Sun Netra X4270 Server September 2015 ...
Page 230: ...WDT W WDT watchdog timers 230 Sun Netra X4270 Server September 2015 ...