
Instruction manual
NivuFlow Mobile 600
page 56
Rev. 00 / 04.09.2017
Start-Up Examples
23 Measurement with Clamp-On Sensors
23.1 General
Measurements with clamp-on sensors can be carried out very easy and with little effort. The
sensors are installed on the outside of the pipe.
Prior to the installation of clamp-on sensors the measuring section shall be prepared and the
measurement place parameters need to be set. For the measurement place basically the
parameters below must be set:
• Number of paths and path arrangement
• Medium to measure
• Pipe circumference or inside pipe diameter or outside pipe diameter
• Wall thickness
• Wall material
• Inner lining material if available
The transmitter uses these settings to calculate the positions of the clamp-on sensors.
After the measurement place parameters have been set the sensor position data can be
directly viewed on the display of the operation module.
Observe the instructions on how to prepare the measuring section in the
>Installation Instruction for Transit Time Sensors<.
23.2 Programming a 1-path diametrically opposed Measurement
In order to set the parameters of a diametrical 1-path measurement it is necessary to enter
all measurement place data into the transmitter. Prior to programming we recommend you to
become familiar with chapter „25 General Programming“ starting at page 61. Chapter „28.1
Menu Measure Place“ starting at page 72 describes how to set the measurement place
parameters.
23.2.1 Simple Parameter Setting
Application Specifications:
• Stainless steel (steel)
• No inner lining
• No sediments in the pipe
•
“diametrical \” path arrangement
• 1 path
Â
Ü
Procedure:
1.
Select “Menu” (top left).
2. Open >Application< menu.
3. Open >Measure Place< Menu.