96
GTXI User's Guide
b) Secure the carrier board to the platform by tightening the
top and bottom mounting screws on the front of the carrier
board.
c) Optional step: Close the front door of the GTXI system
platform. Secure it by pushing the two retaining screws on
the top of the door and then turn them 90 degrees.
2. Turn the power ON for the boards by pressing the appropriate
power switch(es) on the front of the platform.
3. If the installed board uses memory space, reboot to ensure the
memory space is properly reserved.
Installing PC Boards on the GTPC GT7586 Controller
Module
The GTPC Controller Module features two spare ISA slots.
1. Turn the power OFF on the GTXI by pressing the Main and
Auxiliary power switches on the front of the GTXI platform.
2. Open the front door by turning the two screws on the corners of
the door and pulling the top of the door down toward you.
3. Remove any cables connected to the GTPC.
4. Loosen the screws on the four corners of the GTPC.
5. Pull out the GTPC unit.
6. Remove the screws from the top airplate over the GTPC.
7. Insert the PC board in an available slot in the GTPC. Make sure
the PC board is inserted firmly on the bus connections.
8. Screw the bracket for the new PC board to the front of the
GTPC unit.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com