
Commissioning
73
AX000067
3
4 5 6
7
1
2
8
9
3
Fig. 28
1)
Bolt guide
2)
Guide link
3)
End wall top
4)
Countersunk screw
M10x30
5)
Washer 10.5x21x2
6)
Locknut M10
7)
Roll pin 6x30
8)
Washer 21x37x3
9)
Linch pin 5x32
•
Install bolt guide (1) with countersunk screws (4), washers (5) and nuts (6) on the top plate,
right and left machine side.
•
Raise end wall top (3), mount guide link to end wall top and secure with linch pin (9).
•
Mount guide link (2) to bolt guide and secure with washer (8) and roll pin (7), right and left
machine side.
Pos: 119.28 /BA/Anhang - Erstmontage/Ladewagen/Montage der Aufbauten AX Teil 2 @ 155\mod_1363767849006_78.docx @ 1375983 @ @ 1
Rear side walls (in the GD design with two discharge rollers)
9
6 8
AX000022
Figure 29
•
Install the side sheets (6,8) and the hood sheet (9). Secure the connection with coach bolts
and lock nuts.
Pos: 119.29 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1