381298/C
285
transducer ............................................... 106
transducer cables................................. 102, 104
transducer depth.......................................... 51
transducer ................................................. 88
general requirements .................................... 34
transducer sealing plate ............................... 240
about ..................................................... 219
approval .................................... 40, 81, 83, 219
creating ..................................... 40, 81, 83, 219
download............................................ 40, 219
design, manufacturing and mounting ................. 91
prerequisites ............................................ 137
transducer ................................................. 67
transducer cables......................................... 82
transducer for navigation ............................... 73
transducer for purse seiners ............................ 67
transducer for trawlers .................................. 70
production drawing .................................... 243
computer ................................................ 118
mounting house .......................................... 96
Operating Panel ........................................ 120
Operating Panel Power Supply ...................... 122
transducer into the mounting house ................. 106
installation ................................................. 9
unpacking ............................................... 260
sonar room ................................................ 48
sonar room ................................................ 49
cables .................................................... 129
procedures .............................................. 136
list ........................................................ 134
cables .................................................... 129
GPS ...................................................... 204
motion sensor........................................... 208
navigation system...................................... 204
specifications ........................................... 248
verify correct connections ............................ 182
compass ................................................... 27
course gyro ............................................... 27
heading sensor............................................ 27
Motion Reference Unit (MRU) ........................ 28
speed log .................................................. 27
cable requirements..................................... 171
computer .................................................. 20
display ..................................................... 19
Operating Panel .......................................... 22
transceiver ................................................ 21
Transceiver Unit ......................................... 21
K
design, manufacturing and mounting ................. 91
system ..................................................... 16
support .................................................... 36
L
laminar flow ................................................. 57
LCD monitor
installation .............................................. 117
minimum requirements ............................... 254
length
transducer cable .................................... 98, 251
information ............................................... 10
transducer up to its mounting location .............. 100
transportation boxes ................................... 257
unit ....................................................... 257
sonar room ................................................ 49
IEC....................................................... 160
system interconnection cables........................ 134
computer .................................................. 45
installing the Operating Panel.......................... 45
installing the Operating Panel Power Supply ........ 45
maximum distance between bridge units ............. 43
Processor Unit............................................ 45
requirements for the location of bridge units......... 42
transducer ............................................ 51, 88
registered trademark..................................... 10
M
provided with the delivery.............................. 24
cable ..................................................... 160
requirements ............................................ 251
tolerances ................................................. 32
verifying that operational power is correct ......... 181
purpose ..................................................... 9
target audience ............................................ 9
maritime authority
approval of installation drawings ............. 40,
selecting ................................................. 194
about ..................................................... 219
download............................................ 40, 219
Index
Summary of Contents for Simrad SN90
Page 2: ......
Page 117: ...381298 C 115 Related topics Installation summary page 65 Installing the transducer ...
Page 236: ...234 381298 C 372915 Clamping frame Simrad SN90 ...
Page 295: ......
Page 296: ... 2016Kongsberg Maritime ISBN 978 82 8066 179 1 ...
Page 297: ......