Installing the display
The display is normally not included with the SN90 delivery. A generic procedure is
therefore provided.
We assume that you are equipped with a standard set of tools. This tool set must comprise
the normal tools for electronic and electromechanical tasks, such as screwdrivers,
pliers, spanners, a cable stripper etc. Each tool must be provided in various sizes. We
recommend that all tools are demagnetized to protect your equipment.
A suitable location for the display must be defined prior to installation.
Note
Observe the compass safe distance.
Procedure
1
Prepare the location and the necessary tools.
2
Observe the installation requirements.
a
The display must be located so that it is best protected from glare which
reduces readability.
b
The display may be mounted in a panel, on the desktop or bulkhead, or
overhead.
c
Make sure that adequate ventilation is available to avoid overheating.
d
Make sure that the installation allows for the physical vibration, movements
and forces normally experienced on a vessel.
e
Make sure that enough space is provided for maintenance work.
3
Install the display as described in the applicable documentation provided by the
manufacturer.
4
Connect the cables.
Note
When you connect the cables, make sure that they are all properly secured, and able
to withstand the vibration and movements of the vessel.
Summary of Contents for Simrad SN90
Page 2: ......
Page 117: ...381298 C 115 Related topics Installation summary page 65 Installing the transducer ...
Page 236: ...234 381298 C 372915 Clamping frame Simrad SN90 ...
Page 295: ......
Page 296: ... 2016Kongsberg Maritime ISBN 978 82 8066 179 1 ...
Page 297: ......