136
381298/C
Cable procedures
Topics
Prerequisites for cable installation, page 137
General requirements for cable installations, page 137
Connecting the Uninterruptible Power Supply (UPS) to AC mains and vessel ground,
page 138
Connecting AC mains and ground to the Processor Unit, page 139
Connecting power and ground to the Transceiver Unit, page 140
Connecting AC mains and ground to the display, page 141
Connecting the Operating Panel Power Supply to the Processor Unit, page 142
Connecting the video cable from the Processor Unit to the display, page 143
Connecting the USB cable between the Operating Panel and the Processor Unit, page 145
Connecting the dual cable between the Operating Panel and the Processor Unit, page 146
Connecting ground to the Operating Panel, page 147
Connecting external devices to the Processor Unit using serial interfaces, page 148
Connecting external devices to the Processor Unit using Ethernet interfaces, page 149
Connecting the Ethernet cable from the Transceiver Unit to the Processor Unit, page 150
Connecting the transducer to the Transceiver Unit, page 152
Simrad SN90
Summary of Contents for Simrad SN90
Page 2: ......
Page 117: ...381298 C 115 Related topics Installation summary page 65 Installing the transducer ...
Page 236: ...234 381298 C 372915 Clamping frame Simrad SN90 ...
Page 295: ......
Page 296: ... 2016Kongsberg Maritime ISBN 978 82 8066 179 1 ...
Page 297: ......