381298/C
121
a
Position the four nut plates shown in the illustration.
b
Use a 3 mm Allen key to fasten the four special bolts.
c
Mount the bolt covers in the four corners of the Operating Panel.
4
Connect the cables.
Note
When you connect the cables, make sure that they are all properly secured, and able
to withstand the vibration and movements of the vessel.
Topics
Cutout drawing for Operating Panel installation, page 121
Cutout drawing for Operating Panel installation, page 121
Cutout drawing for Operating Panel installation, page 121
Cutout drawing for Operating Panel installation
372
152
401.9
ø7x4
(CD010299_100_001)
All measurements are in millimeters. The drawing is not to scale.
The drawing is not to scale. Unless otherwise specified, all measurements are in
millimeter (mm).
Summary of Contents for Simrad SN90
Page 2: ......
Page 117: ...381298 C 115 Related topics Installation summary page 65 Installing the transducer ...
Page 236: ...234 381298 C 372915 Clamping frame Simrad SN90 ...
Page 295: ......
Page 296: ... 2016Kongsberg Maritime ISBN 978 82 8066 179 1 ...
Page 297: ......