381298/C
265
•
Do not
damage the outer protective skin on the transducer.
Procedure
1
Obtain the necessary lifting equipment, and make sure that the equipment is
certified for the weight.
2
Lift the transducer, sonar head or hydrophone out of the transportation box.
3
Place it in a stable position on the floor/work bench.
4
Inspect the unit for visual damage.
5
Make sure that the relevant protection is kept in place until the final stages of the
installation.
6
Collect and keep the relevant user manuals and/or documents provided with the unit.
7
Observe the handling rules for transducers.
Related topics
Unpacking standard parts and units, page 261
Specifications for storage after unpacking
The unit must whenever possible be stored in its original transportation crate until ready
for installation.
General specifications
During storage, each box must not be used for any purpose for which it was not intended
(work platform, table, steps etc.).
Once unpacked, all equipment must be kept in a dry, non condensing atmosphere, free
from corrosive agents and isolated from sources of vibration.
Note
Do not break the seal to open a circuit board package before the board is to be used.
If the board package is returned to Kongsberg Maritime with the seal broken, we will
assumed that the unit has been used, and the you will be billed accordingly.
Each unit must be installed in its intended operating position as soon as possible
after unpacking. If the unit contains normal batteries, these may have been
disconnected/isolated before the unit was packed. These must then be reconnected
during the installation procedure. Units containing batteries are marked.
Summary of Contents for Simrad SN90
Page 2: ......
Page 117: ...381298 C 115 Related topics Installation summary page 65 Installing the transducer ...
Page 236: ...234 381298 C 372915 Clamping frame Simrad SN90 ...
Page 295: ......
Page 296: ... 2016Kongsberg Maritime ISBN 978 82 8066 179 1 ...
Page 297: ......