146
381298/C
Related topics
Connecting the dual cable between the Operating Panel and
the Processor Unit
The Operating Panel contains all necessary control functions for normal operation of the
SN90. It is connected to the Processor Unit using three cables. The dual interface cable
provides power and serial communication.
Prerequisites
You must be equipped with a
standard set of tools. This tool set
must comprise the normal tools for
cable installation, such as different
screwdriver types, pliers, a cable
stripper and a soldering iron. Each
tool must be provided in various
sizes. We recommend that all tools
are demagnetized to protect your
equipment. Depending on the tasks
at hand, additional tools may be
required.
Context
This is a special cable. It has one common female 15-pin connector in one end leading
to two separate 9-pin connectors (one male and one female) in the two other ends of
the cable. The cable length is 4.5 meters.
This cable is provided with the SN90 delivery.
Procedure
1
Locate the serial connectors
(identified with the two arrows)
on the rear side of the Processor
Unit.
2
Connect the dual cable from
the two sockets on the Processor
Unit to the single socket under
the Operating Panel.
Related topics
List of SN90 cables, page 134
Communication and power cable for the Operating Panel, page 162
Simrad SN90
Summary of Contents for Simrad SN90
Page 2: ......
Page 117: ...381298 C 115 Related topics Installation summary page 65 Installing the transducer ...
Page 236: ...234 381298 C 372915 Clamping frame Simrad SN90 ...
Page 295: ......
Page 296: ... 2016Kongsberg Maritime ISBN 978 82 8066 179 1 ...
Page 297: ......