Setup
Set up the gas cylinder change-over unit either as a standalone unit or mount it on the wall.
Free standing setup:
The attached rubber feet must be stuck on the bottom of the unit.
Wall mounting:
The attached fixing flaps must be mounted at the back. The unit
should be used as a stencil for drilling, and bored accordingly. Use
suitable mounting hardware such as dowels and screws.
Power connection
The unit is equipped with a flexible plug-in power cord. The
plug
disconnects
the unit from the
power supply network
. Compare the power voltage and nameplate data (
note the position of
voltage selection switch)
and plug in the power cord. At delivery, the unit is set up for
230 V
. If
required, it can be switched to
115 V
operation. To change the input voltage, use a suitable tool
to alter the setting of the red selector switch on the side of the unit. So that the indicated setting,
230
, changes to
115
.
Gas supply connection
The gas supply connections of the gas cylinder change-over unit are designed for pressure hoses
with an inner diameter of 4 mm and a wall thickness of 1 mm. Attach the hose connections bet-
ween the gas cylinder, GM 2 gas cylinder change-over unit and the consumer as specified in the
connection drawing. Cut the supplied hose to appropriate lengths. Connect the supplied hose
nozzles to the pressure reducer and secure the connected hoses with ties.
Only two-stage devices should be employed as cylinder pressure reducers, as these will maintain
a constant output supply pressure.
Fig. 1: Gas supply connections
2.
SETUP AND INSTALLATION
50 047 292
5/9
Gas cylinder
Heraeus
INSTRUMENTS
B
A
Connection (output): consumer
Connection (input): gas cylinder A
Unit (consumer)
Cylinder pressure reducer,
max. 1 bar
Connection (input): gas cylinder B
max. 1 ba
r
Connection
panel
GM 2
Summary of Contents for HERAcell 150
Page 82: ...CO2 Incubator HERAcell 150 Operating Instructions 82 16 Certificate of decontamination...
Page 83: ...CO2 Incubator HERAcell 150 Operating Instructions 83 16 Certificate of decontamination...
Page 84: ...Internet http www kendro com...
Page 85: ......
Page 87: ...Valid 10 2005 50047292 B Gas Cylinder Change Over Unit GM 2 Operating instructions GB...
Page 106: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ......
Page 231: ......
Page 237: ...Version 04 2004 50078754 Accessories for CO2 incubators Illustrations and describtion...
Page 249: ...Footprint HERAcell...
Page 250: ...Footprint HERAcell...