CO
2
Incubator HERAcell
®
150 Operating Instructions
63
9.
Cleaning and disinfection
ContraCon decontamination routine procedure:
Fig. 27:
The routine is divided into four phases. Each individual phase or se-
veral phases can be cancelled (i.e. skipped).
If the operating step ”Cancel ContraCon routine” is executed, the routine mo-
ves to the next program phase. To cancel the routine completely, the operating
step must be executed repeatedly until the remaining run time display shows
the value 0.
When the glass door is opened, this operating step cancels the routine
completely.
The remaining run time of the ContraCon decontamination routine designates
the period between the start or the current routine time state and the cooling down
to the preset temperature nominal value (± 2° C).
Heating phase:
Remaining run time approx 25 hours
The work space is heated to a temperature of 90° C while an elevated relative
humidity is created. The current decontamination temperature is shown at the
temperature display.
Decontamination phase:
Remaining run time approx 23 hours
After the decontamination atmosphere has been created, the decontamination
phase with a run time of 9 hours is started.
If the door is opened during this time, the decontamination routine is restarted
automatically as soon as the door has been closed.
Cool-down phase:
Remaining run time approx 14 hours
The device cools down until the originally set temperature nominal value is
reached.
Postheating phase:
Remaining run time approx 3 hours
During the postheating phase, condensate within the device is eliminated as far
as possible; remaining condensate accumulates at the bottom of the work space.
Fig. 27
ContraCon decontamination
routine procedure
Summary of Contents for HERAcell 150
Page 82: ...CO2 Incubator HERAcell 150 Operating Instructions 82 16 Certificate of decontamination...
Page 83: ...CO2 Incubator HERAcell 150 Operating Instructions 83 16 Certificate of decontamination...
Page 84: ...Internet http www kendro com...
Page 85: ......
Page 87: ...Valid 10 2005 50047292 B Gas Cylinder Change Over Unit GM 2 Operating instructions GB...
Page 106: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ......
Page 231: ......
Page 237: ...Version 04 2004 50078754 Accessories for CO2 incubators Illustrations and describtion...
Page 249: ...Footprint HERAcell...
Page 250: ...Footprint HERAcell...