Specifi cations and prices subject to change without notice. Download latest update to this manual on-line.
2-18
Tool, supertube valve tightener (plastic style)
part # 2-60-0123
Place the patch over the damaged tube surface
and use roller or old spoon to squeeze any air
out of the patch, pressing the material together.
Wait at least 24 to 48 hours before
rein
fl
ating the tube.
Pressure test the tube by in
fl
ating it and
checking the patch with soapy water.
If desired, leave the tube in
fl
ated overnight and
recheck it before putting it back into service.
NOTE:
When patching, the relative humidity must
be less than 70%, preferably as low as 40%.
Temperature should be 64°C to 77°C ( 147.2°F.
to 170.6°F.). Bond strength drops very rapidly
with heat or high humidity. Don’t patch the
tube near water or in direct sunlight.
TUBE TOOLS - BUMPER BOAT
Part#
Description
Price
2-60-0046
Gauge, Low Pressure 0-15 (Used for Super Tube)
$58.00
3-96-0024
Gauge, Low Pressure 0-15 (Super Tube & Poly Tube(Motion Pro)
$95.00
2-60-0123
Tool, Super Tube Valve Tightener (Plastic Style)
$5.56
#3-96-0024
Low pressure gauge (reads
up to 15psi)
#2-60-0046