E-4
Appendix E
40A Service Bypass Unit: Specifications and Procedures
Unpacking the Service Bypass Unit
Unpacking the Service Bypass Unit
Use the following procedure to unpack the Service Bypass Unit:
1. Remove the carton containing the Service Bypass Unit (top box).
2. Open the carton.
3. Remove materials such as manuals from the top of the box and set them aside.
4. Lift both cords, then remove the packaging that supports the cords by letting the cords
pass through the opening in the cardboard. See Figure E-2.
Figure E-2 Unpacking the 40A PowerTrust Service Bypass Unit
5. Remove the L-shaped corrugated cardboard pads from the top of the Service Bypass
Unit.
Summary of Contents for PowerTrust A3589A
Page 7: ...Contents Contents 5 ...
Page 8: ...Contents 6 Contents ...
Page 10: ...Contents 8 Figures ...
Page 12: ...Contents 10 Tables ...
Page 14: ...2 ...
Page 20: ...Preface 8 ...
Page 22: ...Preface 10 ...
Page 52: ...1 30 Chapter1 Overview Specifications Figure 1 8 UPS Input Voltage Transfer Points ...
Page 56: ...1 34 Chapter1 Overview UPS Modes Figure 1 10 Simplified UPS 5 5 kVA UPS Block Diagram ...
Page 62: ...1 40 Chapter1 Overview Support Information ...
Page 76: ...2 14 Chapter2 Unpacking and Inspecting Shipping and Storage Requirements ...
Page 104: ...3 28 Chapter3 Installing the UPS Examples of PowerTrust Connections in a System ...
Page 116: ...5 4 Chapter5 Verification Procedures Load Testing ...
Page 148: ...7 6 Chapter7 Cleaning and Maintenance Exchanging Batteries Fan ...
Page 190: ...A 42 AppendixA HP UX UPS Monitor Error Messages Log Only Messages ...
Page 218: ...C 8 AppendixC Configuring the OS for the PowerTrust UPS Power Failing the UPS ...