![Geely CK MR479Q 2007 Workshop Manual Download Page 306](http://html.mh-extra.com/html/geely/ck-mr479q-2007/ck-mr479q-2007_workshop-manual_573684306.webp)
299
Section 2 Heating System
Heating system uses mixed temperature adjustment which controls both cold and hot air and is featured in
outstanding temperature adjustment performance. The cold and hot air can be completely mixed at each
outlet and achieve continuous temperature adjustment. The air duct arrangement on the instrument panel is
shown in Figure 2. The air flow channel system is shown in Figure 3.
I. Heating System Parameter and Structure
Heating system uses water heating structure which uses the engine coolant as the heat source, leads the the
coolant into the heating radiator installed in the vehicle compartment and has the interior or exterior air blow
across the radiator with the blower to increase its temperature. The system consists of the blower assembly,
heating control assembly and heater assembly.
Figure 2 Heating Duct Arrangement
Inside and Outside Air Switch Door
Outdoor Air
Indoor Air
Defogger
Intermidiate outlet
Heater
Blower Motor
Evaporator
Air Mix Door
Heating Radiator
Figure 3 Air Flow Channel System Illustration
Summary of Contents for CK MR479Q 2007
Page 1: ......
Page 52: ...45 Section 4 Fuel Pump Replacement Figure 102 ...
Page 57: ...50 Chapter 5 Exhaust System MR7131A MR7151A MR7161A Component1 Figure 116 ...
Page 63: ...56 Chapter 7 Clutch MR7131A MR7151A MR7161A Component 1 Hydraulic Manipulation Figure 131 ...
Page 66: ...59 Chapter 8 Maunal Transaxle Assembly MR7131A MR7151A MR7161A Component 1 Figure 139 ...
Page 246: ...239 Tweeter Antenna Cable Antenna Assembly Front Speaker Assembly Rear Speaker Assembly ...