GE Multilin
G60 Generator Protection System
8-5
8 THEORY OF OPERATION
8.1 PHASE DISTANCE THROUGH POWER TRANSFORMERS
8
If applied at location H, the relay sees the following input signals:
The relay is set as follows:
XFMR VOL CONNECTION
= “Dy11”
XFMR CUR CONNECTION
= “Dy11”
Consequently, the following signals are applied to the phase AB distance element:
(EQ 8.1)
(EQ 8.2)
This results in the following apparent impedance:
(EQ 8.3)
The above value is a correct measure of the distance from the VT location to the fault. For relay location 2, this certainly
includes the positive-sequence impedance of the transformer:
(EQ 8.4)
Thus, 0.127
Ω
∠
90° + 0.05779
Ω
∠
85° = 0.1847
Ω
∠
88.4° primary side or 2.569
Ω
∠
88.4° on the secondary side.
The above example illustrates how the relay maintains correct reach for fault behind power transformers. When installed at
X, the relay shall be set to 0.687
Ω ∠
85° secondary in order to reach to the fault shown in the figure. When installed at H,
the relay shall be set to 2.569
Ω ∠
88.4° to ensure exactly same coverage.
See Chapter 9: Application of Settings for more information on setting calculations.
INPUT
PRIMARY
SECONDARY
VA
7.584 kV
∠
–5.59°
69.95 V
∠
–5.59°
VB
6.269 kV
∠
–120.1°
54.52 V
∠
–120.1°
VC
7.751 kV
∠
125.5°
65.84 V
∠
125.5°
IA
16.976 kA
∠
–27.6°
10.61 A
∠
–27.6°
IB
33.952 kA
∠
152.4°
21.22 A
∠
152.4°
IC
16.976 kA
∠
–27.6°
10.61 A
∠
–27.6°
V
1
3
-------
V
AB
V
BC
–
10.861 kV 59.9
°
primary or 94.45 V 59.9
°
secondary
∠
∠
=
=
I
3
I
B
–
58.860 kA
27.6
°
primary or 36.75 A
27.6
°
secondary
–
∠
–
∠
=
=
Z
app
V
I
----
94.45 kV 59.9
°
∠
36.75 kA
27.6
–
°
∠
----------------------------------------------
2.570
Ω
87.5
°
∠
secondary
=
=
=
Z
T
at 13.8 kV
(
)
10
100
----------
13.8 kV
(
)
2
150 MVA
----------------------------
×
0.127
Ω
90
°
∠
=
=
Z
L
at 13.8 kV
(
)
30.11
13.8
315
-----------
2
×
0.05779
Ω
85
°
∠
=
=
Summary of Contents for Multilin g60
Page 10: ...x G60 Generator Protection System GE Multilin TABLE OF CONTENTS INDEX ...
Page 32: ...1 22 G60 Generator Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 160: ...4 30 G60 Generator Protection System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Page 486: ...5 326 G60 Generator Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 518: ...6 32 G60 Generator Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Page 532: ...7 14 G60 Generator Protection System GE Multilin 7 2 TARGETS 7 COMMANDS AND TARGETS 7 ...
Page 748: ...D 10 G60 Generator Protection System GE Multilin D 1 IEC 60870 5 104 APPENDIX D D ...
Page 760: ...E 12 G60 Generator Protection System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...